§ 9-57 — Definitions
Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 9-57
Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/6ce03172-6415-44f4-91b6-7f935b83b313
Sec. 9-57. - Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Abandonment means the cessation of mining, quarrying and extraction operations on the site in compliance with the provisions of this article. Commercial extraction operation means the removal or displacement of rock, gravel, sand, clay or similar materials conducted for financial gain. Department means the planning department of the city. Director means the director of the planning department of the city or his regularly authorized deputy. Land resource means the general landform (basic geologic structure), the soil types, and their associated constraints to land use, and underlying mineral resources. Mining means the process of obtaining rock, gravel, sand, clay or similar materials from an open excavation in the earth for financial gain, but not including the removal of minerals extracted by underground methods. Operator means the person, whether proprietor, lessee or independent contractor, actually in charge and in control of the pit or operation being conducted upon the site. Overburden means soil, rock or other materials that lie above a mineral deposit or in between deposits, before or after their removal by surface mining. Owner means a person who owns a site upon which a pit is located or upon which mining, quarrying or commercial extraction operations are being conducted or may be conducted. Permit means any permit issued pursuant to the provisions of this article, together with the application for the permit, the conditions upon which it was issued and any plans, specifications, reports and approved modifications pertaining thereto. Permittee means any person to whom a permit is issued pursuant to the provisions of this article. Pit means any excavation or depression or hole in the ground, natural or artificial, from which sand, gravel, rock, aggregate, clay or similar materials are being or have been dug, mined, extracted or quarried. Quarrying means the process of removing or extracting stone, rock or similar materials from an open excavation for financial gain. Reclamation means the process of land treatment that minimizes water degradation, air pollution, damage to aquatic or wildlife habitat, flooding, erosion and other adverse effects from surface mining operations, including adverse surface effects incidental to underground mines, so that mined lands are reclaimed to a usable condition which is readily adaptable for alternate land uses and creates no danger to public health or safety. The process may extend to affected lands surrounding mined lands, and may require backfilling, grading, resoiling, revegetation, soil compaction, stabilization or other measures. Settling basin means an area devoted to the storage of waste residue. Site means a lot or parcel of land, or a series of contiguous or adjacent lots or parcels of land, described by a lease or similar document, upon which a pit is located or upon which commercial extraction operations are being or may be conducted, and which is covered by a permit. Slope means the exposed surface of an excavation or fill which forms an incline. Ultimate right-of-way means the right-of-way shown as ultimate on an adopted precise plan of highway alignment, or a street right-of-way shown within the boundary of a recorded tract map, a recorded parcel map or a recorded development plan. The latest adopted or recorded document in such cases shall take precedence. If none of these exist, the ultimate right-of-way shall be considered to be the right-of-way required by the highway classification as shown on the master plan of streets. In all other instances, the ultimate right-of-way shall be considered to be the existing right-of-way in the case of a private street, and the existing right-of-way, but not less than 60 feet, in the case of a public street.
(Ord. No. 1879, § 4, 2-8-22)
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.
