§ 9-62 — Application for permit; design standards
Code of the City of Fontana, California (Supp. No. 65: codified through Ordinance No. 1987, enacted April 28, 2026) · Fontana City Code § 9-62
Corpus is an independent public-information project, not the official City of Fontana website. Stable reference: corpuslaw.us/code/76008674-614c-41dd-85fb-71aa78e522b1
Sec. 9-62. - Application for permit; design standards.
(a) Generally. It is the intent of this article to provide a streamlined review process for the consideration of resource extraction uses. In response to the high cost of final engineering design, a two-step permit approval process is hereby established. Step I will enable the applicant to receive consideration of the intended use, reclamation alternatives and environmental impacts. Step II will set forth detailed operating conditions, final site design approval, final engineering and final verification of conformance with the provisions of this article for the purpose of issuing a resource extraction permit. (b) Step I: Preliminary resource extraction request. (1) Application information. The following application information shall be submitted prior to consideration of a preliminary resource extraction request: a legal description of the entire property to be utilized for extractive use and accessory operations, and a general plan of operations including the following: a. A plot plan of the entire property drawn to scale and showing contour intervals of not more than five feet, defining the location and showing the exterior boundaries of the area to be excavated. The plot plan shall also show the locations of any existing structures, easements, watercourses, levees, drainage facilities, underground utilities and roads or improvements adjoining the property. b. The plan shall include a vehicular access plan designed in such a manner as to result in minimum additional vehicular traffic over local residential streets. c. A topographic map prepared by a registered civil engineer or licensed surveyor or licensed photogrammetric surveyor, and a complete report of a comprehensive soils and geologic investigation prepared by a registered civil engineer or registered engineering geologist. The topographic map shall be accompanied by a written report setting forth probable volume and depth of overburden and nonusable materials. d. A description of the proposed operation in all of its phases, including a phasing plan and schedule showing the approximate starting date, the proposed increments of extraction and the sequence in which such increments will be accomplished. Such plan shall also show the approximate future locations of any machinery and processing equipment, excluding vehicles that may be moved during the excavation operations. The plan shall also show the location of proposed buildings and structures, processing plants and other appurtenant equipment, areas to be excavated and their approximate depths, storage of topsoil and overburden, stockpiles, points of ingress and egress, driveways, parking areas, and required setbacks, fencing, berms and screen planting. Where operations include the washing of sand and gravel, the estimated daily quantity of water required and its source and disposition shall be made a part of this description. e. A plan showing the location of proposed protective works, settling basins, desilting ponds and other bodies of water, including a description of provisions to be taken for the conservation and protection of groundwater, the disposition of drainage and the control of erosion. f. A statement of the estimated time required to complete the proposed excavation. g. An environmental impact report and such other environmental documentation as required by the city and outlined in the city environmental guidelines. (2) Processing procedure. a. Certification of completeness of application. Upon receipt of a preliminary resource extraction request, the planning department shall within 30 days certify the request with regard to completeness. Upon certification as complete, the planning department shall forward the complete resource extraction application to the design review commission, planning commission and city council. b. Design review commission. The design review commission shall review the site plan, landscape plans and elevations for the intended operation pursuant to the requirements of chapter 30, article X. Upon completion of the review of the design review commission, the design review commission shall forward its recommendations and recommended approval conditions to the planning commission. c. Planning commission determination. The planning commission shall hold a public hearing on the proposed resource extraction request and forward its recommendation to the city council as outlined in section 30-103. The planning commission recommendation shall include, at a minimum, a statement of the recommended intensity of use, acceptable accessory uses, the suitability of the extraction and reclamation proposals, and suggested conditions for approval. The conditions of approval shall ensure that the resource extraction use and related accessory uses may be conducted and reclaimed without creating a public nuisance or otherwise adversely affecting the public welfare. Furthermore, the commission shall, subject to findings, recommend denial of the resource extraction application if the commission determines that the intent of this article as set forth in section 9-56 cannot be met by the proposed extraction plan. d. City council approval. Upon receipt of the recommendation of the planning commission, the city council shall set a public hearing as provided in section 30-103 to consider the resource extraction application. The city council shall consider all proposed uses, reclamation plans, EIR and other conditions for approval submitted in conjunction with the resource extraction application and the recommendation of the planning commission. The city council shall set forth by resolution the findings leading to the approval or denial of the application. Upon approval of the application, the city council shall set forth such conditions as may be required to prevent creation of a nuisance and to ensure an operation which does not adversely affect the public welfare. Upon approval, the city council shall direct the applicant to submit final engineering designs, operation plans and a reclamation plan to the planning commission for the purpose of verifying the plans and approving the resource extraction permit. (3) Criteria for permit approval. Resource extraction applications and amendments to resource extraction permits may be approved when the planning commission and city council find that: a. The uses proposed are not likely to cause public health or safety problems. b. The uses proposed are compatible with the objectives, policies and general land uses and programs specified in the city general plan. c. The plans and reports submitted incorporate adequate measures to mitigate the probable significant adverse environmental effects of the proposed operation. d. The plans and reports submitted are sufficiently detailed to adequately describe the proposed operation. e. The plan as proposed or amended incorporates adequate measures to restore the site, excluding abandoned pits and previously mined areas, in a diligent manner to a natural-appearing or otherwise usable condition compatible with adjacent areas. (c) Step II: Resource extraction permit. Upon approval by the city council of a resource extraction application, the planning commission, after a public hearing, shall review and approve a detailed resource extraction permit setting forth the conditions for conduct of the resource extraction use, accessory uses, reclamation program and monitoring programs as follows: (1) Resource extraction permit. The resource extraction permit shall include, as a minimum, the following information: a. A topographic map showing the final contours at intervals of not more than five feet. Such map shall be drawn to scale and shall be of sufficient detail to establish that the proposed ultimate uses can be accomplished. The map shall also show the location of all structures, drainage facilities and streets that are proposed to remain after the completion of extraction operations. b. A statement and plan describing or illustrating the ultimate uses for the property upon the completion of extraction operations. Such uses shall conform to the following requirements: 1. The proposed ultimate uses shall be physically and economically feasible. 2. The proposed ultimate uses shall be consistent with any applicable federal plans. 3. The proposed ultimate uses shall be compatible with existing and permitted adjacent uses. The statement and plan shall include any additional information or evidence that may be helpful in explaining the proposed ultimate use. Any subsequent change in the ultimate use proposal which affects the ultimate reuse of the site shall be subject to review and approval by the city planning commission. (2) Reclamation plan. In order to provide assurance that restoration procedures will begin and continue concurrently with excavation operations, a reclamation plan shall be submitted, which shall include the following: a. A final plan showing the property as it will be prepared for the installation and establishment of the proposed ultimate use. b. A phasing plan showing how the area will be incrementally restored to a natural-appearing or otherwise usable condition as excavation operations are completed in one area and moved to the next area. c. A statement and plans describing the proposed rehabilitation methods and procedures, including but not limited to the following: 1. Landscaping plans. 2. Drainage plans and facilities, slope stability and erosion control plans, to be approved by the director of public works. d. An assessment of the effect of implementation of the rehabilitation plan on future mining in the area. (3) Comprehensive design and operation requirements. The following minimum standards shall be incorporated into the resource extraction plan and operation: a. Operational standards generally. All processing and excavating operations shall conform to all applicable mitigations and conditions approved in accordance with the requirements of this article. b. Dust control. All quarries, private truck roads connecting quarries, processing plants or stockpiles shall be maintained so as to control dust. c. Setbacks. No excavation activities shall be carried on less than 50 feet from: 1. The common property line of any parcel of land upon which such uses are conducted. 2. Any highway or street. 3. Any flood control channel or retarding or conservation basin not a part of the proposed mining operation. d. Location of processing apparatus. No rock crushing plant or other apparatus for the processing of rock, gravel or sand, except primary excavation operations, shall be located within 300 feet of the boundary line of any R residential, commercial or specialized employment zoning districts. e. Slopes. No production from an open pit shall be permitted which creates a finished slope steeper than two feet horizontal to one foot vertical (2:1). f. Days and hours of operation. 1. With the exception of trucking, distribution, sale, loading and unloading of products and materials and equipment repairs, all crushing and excavating activities permitted shall be limited to the days of Monday through Saturday, inclusive, between the hours of 7:00 a.m. and 10:00 p.m. The planning commission may approve additional operating hours where continuous pours of concrete or other special circumstances require extended hours. Such extended hours shall be permitted only after conduct of a public hearing. 2. Hours of operation outside of those stated in subsection (c)(3)f.1 of this section may be permitted, subject to prior notification to the director of public works, in the following situations: i. Where required by public authorities to protect the public welfare and safety. ii. Where necessary due to public emergencies. 3. The following noise standards shall be observed during all operations: Affected Land Use (Receiving Noise) | Noise Level | Time Period Residential district | 55 dB(A) | 7:00 a.m.— 10:00 p.m. Commercial district | 60 dB(A) | Anytime Industrial property | 70 dB(A) | Anytime No person shall operate or cause to be operated any source of sound at any location or allow the creation of any noise on property owned, leased, occupied or otherwise controlled by such person, which causes the noise level when measured on any other property, either incorporated or unincorporated, to exceed: i. The noise standard for that receiving land use, as specified in this subsection, for a cumulative period of more than 30 minutes in any hour; ii. The noise standard plus five dB(A) for a cumulative period of more than 15 minutes in any hour; iii. The noise standard plus ten dB(A) for a cumulative period of more than five minutes in any hour; iv. The noise standard plus 15 dB(A) for a cumulative period of more than one minute in any hour; or v. The noise standard plus 20 dB(A) for any period of time. If the measured ambient level exceeds any of the noise limit categories in subsections i, ii and iii of this subsection, the allowable noise exposure standard shall be increased to reflect the ambient noise level. If the ambient noise level exceeds the noise limit category in subsection iv of this subsection, the maximum allowable noise level under this category shall be increased to reflect the maximum ambient noise level. g. Insurance. Before commencing any operations, the operator shall procure public liability insurance with coverages of sufficient amount and term so as to adequately compensate for loss due to either personal injury or to damage to property. Such required insurance shall cover all activities of the operator connected with the uses permitted, and shall be kept in full force and effect at all times during such operations. This insurance shall be assessed by the city in accordance with the provisions of section 9-63. h. Offstreet parking requirements. Offstreet parking shall be provided on the site for all equipment and for all cars of employees. Operations in this zone shall be exempt from all other offstreet parking requirements of the city zoning code. All offstreet visitor and employee parking areas shall be treated or constructed in such a manner so as to minimize dust and blowing sand. i. Screening. 1. Extracting and processing operations shall be screened in such a manner that they are not readily visible from a public street. An opaque screen shall be installed and maintained as necessary in order to minimize such visibility. The operator shall install such screening along the perimeter of the visible portion of the parcel being operated or previously mined. 2. The required screen shall have a total height of not less than six feet. Where there is a difference in elevation on the opposite side of the screen, the height shall be measured from the highest elevation. A screen shall consist of one or a combination of the following types: i. Walls. Walls may be permitted subject to approval of the design review commission. A wall shall consist of concrete, stone, brick, tile or similar type of solid masonry material a minimum of four inches thick. ii. Berms. A berm shall be constructed of earthen materials and it shall be landscaped. iii. Open fences. An open weave or mesh-type fence, when not used in combination with a berm, shall be combined with plant materials to form an opaque screen. iv. Planting. Plant materials, when used as a screen, shall generally consist of dense evergreen plants. They shall be of a kind or used in such a manner so as to provide a continuous opaque screen within 24 months after commencement of operations in the area to be screened. Plant materials shall not be limited to a maximum height. The design shall be prepared by a licensed landscape contractor or a licensed landscape architect. v. Intersections. Required screening shall be set back as required by the city traffic engineer from the point of intersection of a vehicular accessway or driveway and a street; a vehicular accessway or driveway and a sidewalk; and two or more vehicular accessways, driveways or streets. vi. Installation. Required screening shall be installed prior to commencement of operations in a phased manner so that all operations and excavated sites are continuously screened. j. Posting of signs. Within 90 days after an area has been approved for extraction uses, the outer boundaries of the site shall be continuously posted with signs not less than 500 feet apart, and at each change of direction of the boundary line in such a manner as will reasonably give notice to passersby of matters contained in such notice, stating in letters not less than four inches in height: "THIS PROPERTY MAY BE USED AT ANY TIME FOR THE EXCAVATION OF ROCK, SAND, GRAVEL OR CLAY, ROCK CRUSHING PLANT, OR ANY ASSOCIATED USES." The signs shall be of wood or metal and shall be maintained in legible condition at all times. Such signs shall meet all requirements of the design review board. k. Maximum permitted depth of excavation. The maximum permitted depth of excavation shall be 150 feet. l. Excavation below water table. No excavations below historic water tables shall be permitted except as approved by the Santa Ana Regional Water Quality Control Board. m. Fencing. Fencing shall be required and maintained in accordance with the sand and gravel extraction permit. n. Land designated for arterial highways. Whenever a property is traversed by a highway shown on a precise plan of highway alignment, the necessary right-of-way for such highways shall not be excavated, and no permanent structures shall be erected to the extent of the width of the right-of-way plus an additional 50 feet on each side thereof. o. Ingress, egress and traffic safety. Access to any premises shall be only at points designated on the extraction plan and shall be constructed on a level with the pavement of any public street or highway for a distance of not less than 80 feet therefrom, and the 80 feet shall be paved. Adequate sight distance shall be maintained for traffic safety in compliance with the standards and requirements of the city traffic engineer. p. Drainage. 1. Surface drainage shall be controlled in a manner meeting the approval of the director of public works to prevent loose material from filling any existing drainage course or encroaching upon adjoining property and improvements. 2. All provisions to control natural watercourses shall be designed to prevent overflow or diversion of water away from the natural point of discharge, and such provisions shall be subject to review and approval of the city engineer. q. Removal of buildings and equipment. All buildings, foundations and equipment used in the excavation or processing of land resources or in the administration of the resource extraction operations shall be removed within six months of the termination of activities on the property if the buildings are not to be utilized in conjunction with the reclamation plan. r. Noise and vibration control. All development and equipment for conduct of the uses permitted shall be constructed, maintained and operated in such a manner as to reduce noise and vibration to a level consistent with the city noise ordinance. Internal combustion engines shall be equipped at all times with exhaust mufflers in good working condition to control excessive noise. s. Air pollution control. All operations shall be conducted in compliance with all the requirements of the South Coast Air Quality Management District.
(Ord. No. 1879, § 4, 2-8-22)
Ask a question about Fontana law
Corpus searches the Fontana sections it holds and shows the ones that match, with their citations. Free, no sign-in.