§ 12.05.090 — Encroachment permit application
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 12.05.090
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/17235948-de55-444a-b779-2b2037e3dc33
12.05.090 Encroachment permit application.
An application for an encroachment permit, along with payment of any fees or deposit required by this chapter, shall be filed with the city engineer in the form and manner required by the city engineer and shall contain all of the following: (a) The identity of permittee. If the application is made by an authorized agent of permittee, written authorization shall be provided. (b) Engineering plans and specifications of all work to be done in the PROW. The plans and specifications shall be prepared by an engineer or other licensed professional authorized by the state of California to do so, except where such plans and specifications are waived in subsection (c) of this section. The plans and specifications shall show: (1) The design and improvement of the street and facilities, together with the location of all existing facilities, improvements, trees and fences in the PROW along the proposed route and area of work. The form of the plans and the engineering design standards to be used shall be in accordance with Title 17 (Subdivisions), together with standard details and specifications of the city of Fremont. The final plans and specifications are subject to approval by the city engineer. (2) If required by the city engineer, photographs or artist’s renderings of all aboveground visible equipment, from which their fully dimensioned size must be apparent. The submission may be required to include a detailed description of the equipment included within the aboveground installation and any anticipated noise levels. (3) A master and phasing plan of the facilities to be located within the PROW, including a map in a form required by the city engineer. (4) The specific trees, structures, improvements, facilities and obstructions, if any, that permittee proposes to temporarily or permanently remove or relocate. (c) Engineering plans and specifications may be waived by the city engineer for encroachment permits where minor street or facilities work is required, or where existing physical conditions exist that are well defined and can be used to control the work. If uncertainties or difficulties arise from the work during the course of construction, the city engineer may require the engineering plans and specifications to be prepared to complete the work. Where engineering plans and specifications have been waived, any substitute plans and specifications required for the encroachment permit will be determined by the city engineer. (d) A construction work plan. The information required by Section 12.05.150, including but not limited to a construction schedule, final completion date, and specific construction benchmark dates as to identified portions of the project. (e) A traffic control plan describing the manner in which permittee will manage vehicle, bicycle, and pedestrian traffic along affected streets when installing or maintaining facilities. (f) A public notification plan. Permittees may be required by the city engineer to provide reasonable advance notice to the public via a public notification plan of the proposed quantity, precise dimensions, design, color, type, potential noise and location of aboveground facilities. Any such requirement shall take into account the area covered and impacts of the AGFs. (g) Certifications and consents. Upon request, permittee shall provide copies of certifications, licenses, permits, franchises or other applicable approvals of the CPUC, sanitary district, water district or any other public body having jurisdiction, to construct and operate the facilities and to offer or provide the services, including, if applicable, evidence of permission to use other public or private property. (h) Excess capacity. If permittee is proposing an underground installation with new facilities to be constructed within the PROW, it shall agree to provide, upon request, information regarding any excess capacity that will exist in such ducts or conduits after installation of permittee’s facilities, to the city or a subsequent permit applicant. (i) Contact with other permittees. If applicable, permittee shall first seek to use technically compatible excess capacity of other companies by contacting the other permittees specified by the city engineer in writing. If use of excess capacity is not technically compatible, permittee shall provide an explanation to the city engineer as to why any excess capacity cannot be used. (j) Applications for AGFs must include a graffiti mitigation plan consisting of: an explanation of how permittee will maintain the AGFs free from graffiti and other defacements; a commitment to inspect AGFs at least two times a year; identification of the resources dedicated to mitigating graffiti; information for a single point of contact responsible to resolve graffiti issues should they occur; a statement that graffiti shall be removed within 48 hours of the time at which permittee is notified of graffiti; and that the AGF surfaces shall be restored to their original exterior appearance. (k) Other. Other information relating directly to PROW management and use as may reasonably be required by the city engineer. (Ord. 14-2007 § 2, 5-8-07. 1990 Code § 6-1302.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.