For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.05.190 — Excavations

Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 12.05.190

Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/ea39c4e8-464b-460b-9333-28b077eedf29

12.05.190 Excavations.

(a) Applicability. Each excavation in the PROW pursuant to this chapter, whether or not a major encroachment, shall be performed in accordance with this chapter and with the standard plans and specifications of the department and any department orders or regulations. (b) Notices. The permittee shall post and maintain notice at the site before and during the excavation, and provide reasonable advance notice to each property owner on the street affected by the excavation. (c) Limits on Excavation in the Public Right-of-Way. It is unlawful for permittee to make, cause, or permit to be made any excavation in the PROW outside the boundaries, times, and description set forth in the permit. Wires or cables installed underneath the surface of the PROW shall be inside pipes or conduits, unless the city engineer determines that the purpose of the cable or wire is such that it need not be protected. No single excavation site shall be longer than 1,200 feet in length at any time except with the prior written approval of the city engineer. (d) Excavation Sites. Permittee shall cover an open excavation with nonskid steel plates ramped to the elevation of the contiguous street, pavement, or other PROW, or otherwise protected as directed by the city engineer. Permittee shall keep the area surrounding the excavation clean and free of loose dirt or other debris, materials and equipment in a manner deemed satisfactory to the city, including if necessary a storm water pollution prevention plan. Fill material, sand, aggregate, and asphalt-coated material may be stored at the site only if it is stored in covered, locked containers. Permittee shall be subject to city engineer orders regarding excavation sites, including: hazardous material guidelines for data collection; disposal, handling, release, and treatment of hazardous material; site remediation; and worker safety and training, and shall comply with all federal, state, and local laws regarding hazardous materials. (Ord. 14-2007 § 2, 5-8-07. 1990 Code § 6-1406.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.