§ 12.10.080 — Street improvement requirement
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 12.10.080
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/51ca1efc-d778-4d55-b355-45b328f2f6c9
12.10.080 Street improvement requirement.
(a) Determination of Specific Street Improvement Facilities Required. The standard for determination of the description and design of the street improvements specifically required to be constructed by a lot user upon and within each street abutting and crossing the lot of such lot user established pursuant to Sections 12.10.050 and 12.10.070(a) shall be based on standard details and specifications adopted by the city council for use in connection with the design and construction of streets upon and within rights-of-way, and any special standards prescribed by the city council specifically for the design of any such particular street in connection with the establishment thereof pursuant to Section 12.10.050. Said standard shall be supplemented by standards established pursuant to the subdivision ordinance for the design and improvement of streets, utility entity standards, and standards of local customary engineering practice approved by the public works director. Said determination shall be subject to a final precise determination in connection with the preparation of and approval of construction plans required pursuant to Section 12.10.100. (b) General Requirement for Full Extent of Street Improvements. The lot user shall construct the full extent of the specifically required street improvement facilities, as determined pursuant to subsection (a) of this section, within the entire dimensions of each street abutting and each street crossing the lot, except as provided otherwise in this section. Where the full extent of vehicular paving or other specific street improvement facility, required to meet the standards prescribed pursuant to subsection (a) of this section for a particular street abutting or crossing a lot subject to the provisions of this chapter, exceeds the maximum requirement for such vehicular paving or other street improvement facility applicable to such lot as determined pursuant to the provisions of this section, the construction or reconstruction of any such excess street improvements shall be the responsibility of the city, and if the lot user and city do not provide for the construction of such excess street improvements by the lot user in accordance with a special arrangement made pursuant to Section 12.10.110, the city shall provide for the construction of such excess street improvements subject to the available financial resources of the city. (c) Limitations on Maximum Requirement. Said requirement set forth in subsection (b) of this section to construct the full extent of required street improvements within the entire dimensions of a street is limited or excepted in regard to certain specific street improvement facilities, depending upon particular types of lot uses, or upon the ultimate width prescribed for certain streets, as follows: (1) Vehicular Paving. The maximum width of the paving requirement for any street abutting a lot shall not exceed 45 feet (the half-width of a six-lane divided thoroughfare). Such limitation on the maximum width of the paving requirement shall be applied to each side of a street crossing a lot. (2) Industrial Use Lots, Frontage Roads and Sidewalks. The maximum width of the paving requirement for any frontage road crossing an industrial use lot in any industrial zoning district shall not exceed 36 feet. (3) Medians. A lot user shall be required to construct the curbing and gutter of a prescribed median within the street abutting or crossing a lot, but shall not be required to construct landscaping or any other facilities upon or within a median, except street lighting when required to be constructed therein by a lot user. (d) Location of Vehicular Paving. Where the maximum extent of vehicular paving required to be constructed by a lot user within a particular right-of-way of a particular street, as determined pursuant to subsections (b) and (c) of this section, is less than the full extent of paving prescribed for such street pursuant to subsection (a) of this section, the paving to be constructed by the lot user shall be constructed at the location or locations within such right-of-way in accordance with the following standards: (1) Where the right-of-way has not been previously improved at all with paving, or all paving previously constructed is to be removed, the paving to be constructed shall commence at the planed gutter lip adjacent to the planned vehicular roadway portion of the street. (2) Where the right-of-way has been previously constructed with existing paving which is to be retained, the paving to be constructed shall commence at the edge of such retained existing paving. (3) Notwithstanding the foregoing provisions, such paving shall be constructed at such location or locations as determined by the public works director to best provide for and protect the public safety and to best serve the practical utilization of the paving to be constructed by the lot user and any said existing paving to be retained. (e) Transitional Vehicular Paving. Where, as the result of the application of subsections (b), (c) and (d) of this section to a particular street abutting or crossing a lot, the right-of-way would be unimproved with vehicular paving at a location or locations which the public works director finds would create a hazard detrimental to the public safety or contrary to the practical utilization of the paving to be constructed by the lot user pursuant to said subsections, the lot user shall construct transitional vehicular paving at such location or locations, as follows: (1) between any existing paving to be retained and the pavement section to be constructed by the lot user within such street; (2) between paving within such street (existing and/or to be constructed) and the driveway or other access point or points of the lot; (3) between paving within such street (existing and/or to be constructed) and other paving existing within the right-of-way of the same street but which abuts or crosses another lot or lots located adjacent or contiguous to the terminus or termini of the right-of-way of the street abutting or crossing the lot user of the lot subject to the application of the provisions of this chapter. (f) Exemption or Deferment for Lot Area or Lots Not Used. Where the use of a lot does not and is not proposed to exceed 60 percent of the lot area of such lot, or where a lot or lots created as the result of a division of land not constituting a subdivision are not and are not proposed to be used (all such lots created by said division being a single lot as defined in this chapter), such lot or lots shall be exempt from the application of the street improvement requirement, to the extent that any street or portion of any street abutting or crossing that part of the lot which is not and is not to be used in excess of said 60 percent of the lot area of such lot, or the lot or lots created as the result of such division which are and are not to be used. Provided, that such exemption shall not apply where the public works director finds that the street improvement requirement is necessary to be maintained, in whole or in part, to avoid a serious hazard detrimental to the public safety caused by or which will be caused by the use of, or to provide for the practical utilization of the street improvements required to be constructed upon and within the right-of-way of any such street abutting or crossing, the part of the lot not exceeding said 60 percent which is or is proposed to be used, or the use of the lot or lots created as the result of said division which are or are proposed to be used. Provided further, that in the event the lot user proposes to use all or a part of the lot exceeding 60 percent of the lot area, or a lot or lots created as the result of the division of land, pursuant to a program or schedule for the development of the use of such lot or lots the commencement of which is at least one year beyond the date the lot user is subject to the application of the provisions of this chapter, such proposed use may be deemed to be within the exemption provided pursuant to this subsection until such time as the use of said part of the lot exceeding 60 percent of the lot area is used, or the lot or lots created as the result of the division of land is used, and the lot user becomes subject to the application of the provisions of this chapter. Alternatively, the public works director may defer determination of the street improvement requirement to a date certain, or require the lot user to enter into an agreement pursuant to Section 12.10.120 specifying a completion date or dates for required street improvements in accordance with the phases or units of such program or schedule. Any exemption provided from the street improvement requirement pursuant to this subsection shall not be deemed to grant any similar exemption from the requirement to provide right-of-way pursuant to Section 12.10.070, nor to affect the street improvement requirement for the part of the lot or the lot or lots which are or are proposed to be used. (g) Utility Facilities. A lot user of a lot subject to the application of the provisions of this chapter shall construct street improvement facilities consisting of utility facilities such as storm drains and other flood control facilities, water and sanitary mains, gas lines, communications facilities, and other utility conduits and casings, within the public right-of-way of each street abutting and crossing the lot, determined by the public works director to be necessary to serve the lot of the lot user and/or other lots and the general public, subject to the policies, tariffs, rules and regulations of the public or private utility entity having jurisdiction over any such utility facility and in accordance with the standards prescribed therefor pursuant to subsection (a) of this section and such utility entity. All such utility facilities shall be constructed prior to the construction of other street improvement facilities at the location or locations under, within or upon the right-of-way of the street to be improved, in order to avoid unnecessary disruption to the subsequent use of such street and the reconstruction of such other street improvement facilities if any such utility facility was constructed subsequently. The requirement for such prior construction of utility facilities is a primary purpose for requiring such utility facilities to be constructed pursuant to this section (in addition to accomplishing the specific intent and purposes of this chapter). The extent of the requirement to construct any such utility facility which is not to serve or otherwise benefit the lot shall be limited to a requirement to construct only such utility conduits and casings for such utility facilities necessary to accomplish said primary purpose of avoiding the necessity for subsequent reconstruction of other street improvement facilities, including either the connection of the termini of any such utility conduits or casings to the same utility facilities located contiguous to or within the right-of-way of the street abutting or crossing the lot, or the temporary capping or sealing of said termini if the utility facilities which are intended to be connected thereto are not so contiguous to or within said right-of-way. (h) Right-of-Way to Be Improved. The right-of-way to be improved by a lot user in accordance with the street improvement requirement of this section includes not only any right-of-way of the streets abutting or crossing the lot of such lot user which has been provided by the lot user pursuant to Section 12.10.070, but also any right-of-way for such streets which has been acquired by the city by other means, including acquisition pursuant to Section 12.10.070(e) or 12.10.110, or by purchase or condemnation from the lot user and/or other owners of said right-of-way and title or sufficient possessory right to which is obtained by the city to enable the lot user to construct the required street improvements therein. (Ord. 924 § 1, 9-12-72; Ord. 1292 § 1, 11-21-78; Ord. 1641 § 2, 12-18-84; Ord 6-2012 § 3, 5-1-12. 1990 Code § 8-3107.)
Prior legislation: Ords. 189, 313, 702 and 832.
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
