§ 15.10.110 — Amendment of 2025 CBC Section 111 (Certificate of Occupancy)

Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 15.10.110

Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/8c2f1908-fc3b-4de2-84f9-5aff62d1221a

15.10.110 Amendment of 2025 CBC Section 111 (Certificate of Occupancy).

Section 111 of the 2025 California Building Code is amended as follows: 111.1 {CBC text not modified} Exception: Single-family homes, townhomes, and U occupancies. The final and signed building permit by the building inspector will act as a certificate of occupancy. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the codes or of other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of the codes or other ordinances of the jurisdiction shall not be valid. 111.1.1 Change in Use. Where a change of occupancy and use is proposed and approved by the building official, an inspection of the premises by the building official to determine that the provisions of Section 111.1 are met before issuance of said certificate is required. Said certificate of occupancy shall be obtained from the building official upon completion of an application for the certificate and the payment of a fee as established by resolution of the city council. 111.2 Certificate issued. After final inspection when it is found that the building or structure complies with the provisions of this code and other laws which are enforced by the city of Fremont, and, when required by the building official, the engineer or architect of record shall state, in writing, that based on field observation conducted by him or her, or his or her designee, the building or structure is in general conformance with the approved plan, then the building official shall issue a certificate of occupancy which shall contain the following: 1. The building permit number. 2. The address of the building. 3. The name and address of the owner. 4. A description of that portion of the building for which the certificate is issued. 5. A statement that the described portion of the building complies with the requirements of this code for the group and division of occupancy and the use for which the proposed occupancy is classified. 6. The name of the building official. 7. The use and occupancy. 8. The type of construction. 9. The design occupant load. 10. Where an automatic sprinkler system is provided, whether the sprinkler system is required. 11. The edition of the code under which the permit was issued. 12. Any special stipulations and conditions of the building permit. 111.3 {CBC text not modified} 111.3.1 Limitations. An application for temporary certificate of occupancy must be obtained for connection of gas and electrical utilities. The required fees as established in a city of Fremont resolution shall be paid before the temporary certificate of occupancy is issued. 111.3.2 Discontinuance of temporary occupancy. In the event the building is not completed and ready for final inspection in the time prescribed by the building official, the building shall be vacated and the utilities disconnected until such time as the building is completed and final inspection is made and a certificate of occupancy is issued as set forth above. 111.4 {CBC text not modified} (Ord. 13-2025 § 3, 11-18-25.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.