For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.10.170 — Amendment to 2025 CBC Section 1803 (Geotechnical Investigations)

Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 15.10.170

Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/d57cd950-2a7f-4f8d-8a33-6e8c4e934d93

15.10.170 Amendment to 2025 CBC Section 1803 (Geotechnical Investigations).

Section 1803 of the 2025 California Building Code is amended as follows: 1803.1 – 1803.1.1.5 {CBC text not modified} 1803.2 {CBC text not modified} Exceptions: The following occupancies are exempt: 1. Group U occupancies; 2. Additions to R3 occupancies: a. First floor additions; a.1 Existing building has a continuous foundation (spread footing); and a.2 New foundation dimensions at minimum meets requirements from CBC Table 1809.7 and are 15” embedded into undisturbed soil; and a.3 Building site is not within seismic induced landslide hazard zone. b. First floor additions; b.1 Existing buildings have pier and grade beam foundation system; and b.2 New piers and grade beam system shall be designed by an Architect, Civil, or Structural engineer registered in the State of California; and b.3 New piers shall be minimum of 16 inches in diameter, and eight feet in depth; and b.4 Building site is not within seismic induced landslide hazard zone. c. Second-story additions over existing structure; c.1 The Architect or Engineer of Record certifies in writing that any new foundation type matches existing foundation; and c.2 When an Architect, Civil or Structural engineer registered in the State of California provides the structural design; and c.3 Building site is not within seismic induced landslide hazard zone. 3. A new soil report is not required when an existing soil report is available for the original construction of the existing structure and the soil engineer allows extension of the existing report for the proposed addition construction. An amended soil report is required to meet the investigated conditions (CBC Section 1803.5) and reporting requirements (CBC Section 1803.6). 4. Accessory Dwelling Units (ADU’s), accessory buildings, and minor additions may be exempted by the building official. 1803.3 – 1803.5.12 {CBC text not modified} 1803.6 {CBC text not modified} 1. – 11. {CBC text not modified} 12. Drainage and erosion control recommendations. 13. Minimum building setbacks to slope tops or toes. 14. Equivalent-fluid-density lateral loads used in design of retaining walls or basement walls. 15. Ground response evaluation by geologist licensed in California for: a. Flexible structures located on site having soft to medium cohesion less soils in upper 50 feet and depth to bedrock is 400 feet or greater; and b. Structures having irregular shapes, framing systems, or other unusual features as determined by the building official. 16. Liquefaction evaluation for the following uses: a. Subdivisions of Group R-3 occupancy having four units or more; b. Apartment or condominium complexes of Group R- 2 occupancy having 50 or more units; c. Structure of four or more stories or over 35 feet high; d. Commercial, industrial, and institutional projects having 250 occupants or more; e. Essential facilities. 17. Slope stability evaluation in areas subject to localized or major landslides. 18. Surface rupture evaluation by geologist licensed in California for all projects for human occupancy located with a Geologic Hazards Special Studies Zone, as mapped by the California Division of Mines and Geology. 19. Soil corrosive analysis and long-term corrosion control design recommendations. 1803.7 {CBC text not modified} 1803.8 Review. Before issuing a permit for a building where soil and foundation investigation is required, the Geotechnical Engineer or Civil Engineer who prepared the soil investigation shall state in writing (must be signed and stamped): 1. The plans and specifications substantially conform to the recommendations in the soil investigation. 2. The Geotechnical Engineer or Civil Engineer who prepared the soil investigation has been retained to provide soil site observation and provide periodic and final reports to the city. 1803.9 Field Report. Before requesting a foundation inspection from the city, the Geotechnical Engineer or Civil Engineer who prepared the soil investigation shall provide a written field report stating: 1. The building pad was prepared and compacted in accordance with the soil report and specification. 2. The foundation or pier excavation, depth, backfill materials, and drainage (if applicable) substantially conforms with the soil report and approved plans. 1803.10 Final Report. Before final inspection for any building or structure, the Geotechnical Engineer or Civil Engineer who prepared the soil investigation shall issue a final report stating the completed pad, foundation, finish grading, drainage, and associated site work substantially conforms to the approved plans, specifications, and investigation. (Ord. 13-2025 § 3, 11-18-25.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.