§ 18.187.040 — Permits required – Approval authority
Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.187.040
Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/340432cc-dec8-490e-835c-3dcde24d66b5
18.187.040 Permits required – Approval authority.
(a) Design Review. All wireless facilities other than those in the public right-of-way require a design review permit and a building permit in addition to a conditional use permit or zoning administrator permit, if required in Table 18.187.070. (1) A ministerial design review permit, subject to Chapter 18.235, shall be required for collocations, modifications and upgrades to any wireless facilities as well as facade- and roof-mounted wireless facilities permitted by right. (2) A discretionary design review permit, subject to Chapter 18.235, shall be required for new wireless facilities in addition to a conditional use permit or zoning administrator permit, if required in Table 18.187.070. Wireless facilities proposed to be located in the public right-of-way require a ministerial or discretionary design review permit and an encroachment permit, subject to all applicable standards under Chapter 12.05 (Encroachments to Streets and Sidewalks) and Section 18.187.150 (Wireless facilities in the public right-of-way). (b) Section 6409(a) Eligible Facilities Request. Projects that involve modifications to an “existing wireless tower” or “base station” in order to collocate, remove or replace transmission equipment, but would not substantially change the physical dimensions(s) of such tower or base station may be eligible for review under Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012, codified at 47 U.S.C. Section 1455 (“Section 6409(a)”). If deemed eligible, these projects shall be processed in accordance with the timeframes and approval process established by Section 6409(a) and implementing federal regulations. Proposed projects that involve a substantial change, as defined in Section 18.25.3225, are ineligible for review under Section 6409(a) and shall be reviewed in accordance with the permitting process outlined in Table 18.187.070. Projects that qualify as an eligible facility under Section 6409(a) require concurrent processing of a ministerial design review permit and building permit. (c) Zoning Administrator Permit. A zoning administrator permit shall be required for all wireless facility uses listed as zoning administrator permitted uses in Table 18.187.070. (d) Conditional Use Permit. A conditional use permit shall be required for all wireless facility uses listed as conditional uses in Table 18.187.070. (e) Historical Architectural Review Board (HARB). (1) Historical Overlay District (HOD). Where a wireless facility is proposed within an HOD and review is required in accordance with Chapter 18.135, the project shall also be reviewed by the historical architectural review board (HARB). (2) Register/Potential Register Resources. Where wireless facilities are proposed that could affect an historic or potentially historic resource, the project shall be reviewed by HARB in accordance with Chapter 18.175. (f) Other Required Permits and Approvals. In addition to any permit required under this section, an applicant must also apply for and obtain any separate permit or approval required for such wireless facilities under the municipal code, including, but not limited to, building, electrical, and encroachment. (Ord. 09-2017 § 1, 6-6-17; Ord. 02-2020 § 25, 1-14-20.)
Ask a question about Fremont law
Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.
