For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.187.050 — Application requirements

Fremont Municipal Code (Fremont Municipal Code current through Ordinance 02-2026 passed May 5, 2026 (Code Publishing Company, codepublishing.com, scraped 2026-11-18)) · Fremont Municipal Code § 18.187.050

Corpus is an independent public-information project, not the official City of Fremont website. Stable reference: corpuslaw.us/code/38d45eb4-1a3c-401f-a94d-e361a63ec933

18.187.050 Application requirements.

(a) General. (1) For all proposed wireless facilities other than those in the public right-of-way, the applicant shall provide the following information: (A) A map showing how the proposed wireless facility fits within the network of the applicant’s existing and proposed antenna sites. (B) Alternate site locations within a search ring. (C) A letter explaining the site selection process including information about the other sites that were considered and reasons for their rejection; power rating for all antennas and backup equipment proposed with first application. (D) The types and range of sizes of antennas and equipment cabinets available for use by the applicant. (E) The proposed design and, if applicable, why a more preferable design cannot be used, as set forth in Section 18.187.080. (F) A map identifying all existing wireless facilities within a 3,000-foot radius and reasons for not co-locating with existing wireless facilities. (G) Visual impact analysis that includes photo-simulations showing existing and proposed scenarios and section drawing that shows height of proposed wireless facilities as viewed from any public right-of-way. (H) A radio frequency (RF) report demonstrating that the proposed installation, including antennas and associated equipment cabinets, conforms to the radio-frequency radiation emission standards adopted by the FCC. (I) A noise study, prepared, signed and stamped by a California-licensed engineer, for the proposed wireless facility and all associated equipment, which shall include without limitation all environmental control units, sump pumps, temporary backup power generators, and permanent backup power generators. The noise study shall include without limitation the manufacturers’ specifications for all noise-emitting equipment and a depiction of the proposed equipment relative to all adjacent property lines. (2) For all proposed wireless facilities in the public right-of-way, the applicant shall provide the following information: (A) For proposed wireless facilities on street light poles, written evidence of and agreement with or other evidence of authority of the owner of the facility if not owned by the applicant. (B) A map showing the precise location of the proposed wireless facility, including adjacent street names, adjacent street addresses, geographic coordinates, and utility pole number if available. (C) A photographic image showing the proposed location and immediate surroundings. (D) A photo simulation showing the proposed wireless facility installation. (E) A scaled elevation drawing of the proposed installation including the size and dimensions of the proposed equipment and, for pole installations, the equipment shroud. (b) Monopoles. For all proposed monopole facilities, the applicant shall provide a structural report identifying the number and type of antennas that the structure would be designed to support. (c) Section 6409(a) Eligible Facilities Request. In order to determine whether a proposed wireless facility is eligible for the process set forth in Section 18.187.040(b), the applicant shall provide a checklist with the following information: (1) Height. Description and dimensions of proposed change in height of the structure, including existing and proposed height. (2) Width. Description and dimensions of proposed change in width of the structure, including existing and proposed widths. (3) Other Modifications. Description of additional modifications, including, but not limited to, the number and size of additional cabinets, and any excavation or deployment beyond the existing site. Applications determined eligible for a Section 6409(a) eligible facilities request shall be exempt from the general and monopole-specific submittal requirements listed above. (Ord. 09-2017 § 1, 6-6-17; Ord. 02-2020 § 26, 1-14-20.)

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.