8.35.130 New hazardous materials facilities.

(a) Requirement for Certificate of Occupancy. No person, firm or corporation shall receive a certificate of occupancy for any facility involving the handling of hazardous materials until a permit or approval has been issued pursuant to this chapter. (b) Monitoring Capability. All facilities intended for the handling of hazardous materials shall be designed and constructed with a monitoring system capable of detecting when the material stored in the primary containment has entered the secondary containment. Daily visual inspection of the primary containment is the preferred method; however, other means of monitoring may be required. Where secondary containment may be subject to the intrusion of water, a means of monitoring for such water intrusion and for safe removal of the water shall be provided. Whenever monitoring devices are provided, they shall, where applicable, be connected to attention-getting visual and audible alarms, tested at regular intervals and adequately maintained. (c) Containment Requirements. Primary and secondary levels of containment shall be required for all facilities intended for the storage, use or handling of hazardous materials. (1) All primary containment shall be product-tight. (2) Secondary Containment. (A) All secondary containment shall be constructed of materials of sufficient thickness, density, and composition so as not to be structurally weakened as a result of contact with the hazardous material and so as to be capable of containing hazardous material discharged from a primary container for a period of time equal to or longer than the maximum anticipated time sufficient to allow recovery of the discharged material, but not less than 96 hours in any case. (B) In the case of an installation with one primary container, the secondary containment shall be large enough to contain at least 110 percent of the volume of the primary container. (C) In the case of a facility with multiple primary containers, the secondary container shall be large enough to contain 150 percent of the volume of the largest primary container placed in it, or 10 percent of the aggregate internal volume of all primary containers in the facility, whichever is greater. (D) If the facility is open to rainfall, then the secondary containment must be able to additionally accommodate the volume of a maximum 24-hour rainfall as determined by a 100-year storm history. (E) If water could enter into the secondary containment, the facility shall contain a means of removing the water. This removal system shall also provide for a means of analyzing the removed water for hazardous substance contamination and a means of disposing of the water, if so contaminated, by an authorized disposal method. (F) If the facility is subject to internal fire suppression sprinklers, then the secondary containment must be able to additionally accommodate the volume of a maximum 20-minute sprinkler burst. (G) Facilities must maintain all required permits with Union sanitary district, California Department of Health Services, and the Bay Area air quality management district. (3) Laminated, coated, or clad materials shall be considered single-walled and shall not be construed to fulfill the requirements of both primary and secondary containment. (d) Piping. (1) All piping, valves, and fittings shall be designed for maximum working pressures and structural stresses to which they may be subjected. They shall be of material suitable for use with the product being handled. (2) All piping, both aboveground and underground, where subject to external corrosion, shall be cathodically protected in conformance with the requirements of the Uniform Fire Code. (3) All piping shall be provided with secondary containment as in subsection (c)(2) of this section. (4) The secondary containment of the piping may lead back to the container’s secondary containment. (5) Underground pressurized piping that conveys a hazardous substance shall be equipped with an automatic line leak detector which shall be tested at least annually. (e) Spill and Overflow Protection. Means of spill and overflow protection may be required for any primary container. Underground tanks must have a minimum of 15 gallons of overfill protection for each primary container. (f) Separation of Materials. Materials which, when combined, may result in a hazardous condition, or may cause a fire or explosion, or the production of a flammable, toxic, or poisonous gas, or the deterioration of a primary or secondary container, shall be separated in both the primary and secondary containment so as to avoid potential intermixing. (g) Drainage System. Drainage of precipitation from within a facility containing hazardous materials shall be controlled in a manner approved by the city so as to prevent hazardous materials from being discharged to the sanitary sewer or to navigable waterways without the appropriate permits. (h) Professional Engineer Stamp. The city may require design submittals to bear the signature and stamp of an engineer, or other professional, registered with the state of California. (1) Technical assistance for completing required documentation may be provided by environmental consultants in the private sector. Reports, documents, and plans which contain engineering, geology, and/or geophysical information must be prepared under the direction of properly licensed individuals in the state of California (Cal. Bus. & Prof. Code §§ 6735, 7835 and 7835.1). Responsibility for the technical information is indicated by the signature and stamp of the seal of the licensed individual. More than one signature and seal may be required where more than one professional specialty is included in the technical document submitted. (2) All borehole and monitoring well logs, excavation procedures, and soil/ground water samplings are to be certified by a registered geologist, certified engineering geologist, or registered engineer. All subsurface geologic data from boreholes, monitoring wells, trenches, etc., are to be displayed on geologic cross-sections. (i) Installation of Equipment. All hazardous materials equipment shall be properly installed. Proper installation shall include, but not be limited to, adequate anchoring and support. (j) Operation and Maintenance of Equipment. All emergency equipment and other equipment, the failure of which may result in an unauthorized spill or significant harm to the environment, the community, or employees, will receive appropriate preventative maintenance, which will be recorded. Calibration, testing and major repairs will be recorded and performed in a timely manner. (1) All equipment shall be operated only within design limitations and maintained in good working order. (2) No hazardous materials equipment shall be exposed to significant damage from the routine operation of forklifts, normal traffic, or vandalism. (Ord. 1946 § 6, 11-27-90. 1990 Code § 3-12301.)

Prior legislation: Ords. 1632, 1643 and 1686.

Ask a question about Fremont law

Corpus searches the Fremont sections it holds and shows the ones that match, with their citations. Free, no sign-in.