§ 13.40.320 — Permit—Where required
Code of Ordinances, City of Glendale, California (Code 2026-05-19) · Glendale Code of Ordinances § 13.40.320
Corpus is an independent public-information project, not the official City of Glendale website. Stable reference: corpuslaw.us/code/191c7d39-ba97-4f8a-a817-8ba212637640
§ 13.40.320: Permit—Where required.
A. Application. No person shall discharge any industrial waste into the sanitary sewer or storm drain system, or both, without obtaining an industrial waste permit from the fire chief in the case of discharge to the sanitary sewer, and from the California Water Quality Control Board in the case of discharge to the storm drain system. B. A separate permit shall be required for each point of discharge to the sanitary sewer, the storm drain system, and to the waters of the state. In connection therewith, the applicant may be required to furnish the following: 1. The name and address of the applicant; 2. The name and address of the discharger; 3. The address or location of the premises where the discharge will take place; 4. The Standard Industrial Classification (SIC) of the discharger; 5. Information with respect to constituents and characteristics of wastewater proposed to be discharged including, but not limited to, those referred to in Section 13.40.310 and Chapter 13.42 of this code. Sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to Section 304(g) of the Federal Water Pollution Act of 1972 and contained in 40 Code Federal Regulations, Part 136, as amended, and by laboratories certified by the state of California. In the absence of a state certification process, the fire chief may certify a laboratory to perform necessary sampling and analysis; 6. Time and duration of the proposed discharge or discharges; 7. Average daily and five-minute peak wastewater flow rates, including daily, monthly and seasonal variations, if any; 8. Site plans, floor plans, mechanical and plumbing plans and details to show all sewers and storm drains, connections and appurtenances by their size, location and elevation; 9. Description of activities, facilities and plant processes on the applicant's premises, including all pollutants which could be discharged; 10. Detailed plans showing pretreatment facilities, sampling facilities, uncontrolled discharge containment facilities, and operating procedures; 11. Identification of the nature and concentration of any pollutant located at the premises of the discharger (and/or applicant if different) if that pollutant is prohibited from discharge under Chapter 13.42 of this code, Section 13.40.310(B)(1), or any proposed discharge which is regulated as provided in Section 13.40.310(B)(2) plus a statement specifying whether the specific limitations set forth in such Section 13.40.310(B)(2) are being met, and if not, what additional operation and maintenance or pretreatment is proposed by the discharger to cause compliance; 12. The shortest time schedule by which the discharger will provide the necessary additional pretreatment, if additional pretreatment or operation and maintenance will be required to meet the regulations in Section 13.40.310B or Chapter 13.42 of this code. Any completion date in such a proposed schedule shall not be later than the compliance date established by the applicable regulation. a. The schedule shall provide for reporting increments progress in the form of dates for commencement and completion of major events leading to the construction and operation of additional pretreatment necessary for the discharger to meet the applicable regulation (e.g., hiring an engineer, completing preliminary and final plans, executing contract for major components, commencing construction, completing construction). b. After permit issuance, progress reports shall be submitted subject to the same limitations set forth in Section 13.40.360(A)(7) or Chapter 13.42 of this code, except that time limits specified pursuant to this section for reporting, commencement and completion of major events leading to the construction and operation of additional pretreatment required for the discharger to meet the applicable regulations may be extended by mutual consent of the discharger and the fire chief and provided, however, that in no event shall any such date be extended beyond the compliance date established by the applicable regulation; 13. Each product of the discharger by type, amount and rate of production; 14. Type and amount of raw materials processed by the discharger (average and maximum per day); 15. Number of employees, hours of operation of plant, and hours of operation of the proposed pretreatment system; 16. Copies of any current city business license, National Pollutant Discharge Elimination System permit, South Coast Air Quality Management District permit, Regional Water Quality Control Board permit and State Department of Health Services permit for the subject premises; 17. The name, business address and motor vehicle driver's license number of the authorized representative; 18. Any other information deemed by the fire chief to be necessary to evaluate the permit application. C. The application shall be signed under penalty of perjury by the authorized representative of the discharger. After evaluation and acceptance of the data furnished, the fire chief may issue an industrial wastewater permit and may impose terms and conditions pursuant to Section 13.40.330. Granting of the permit shall not relieve the discharger from the responsibility for compliance with all provisions of this section. By acceptance of a permit the applicant thereby delegates authority to the fire chief to enter the premises of the applicant as necessary for purposes of inspection and maintenance with respect to the wastewater discharge therefrom. D. Exemptions. An industrial wastewater permit is not required for the following discharges or dischargers to the sanitary sewer: 1. Food service facility without cooling equipment or limited discharge as in subsection (D)(3) of this section; 2. Bleedoff or blowdown from cooling towers, evaporation condensers or other recirculation water devices with rated capacity of twenty-five tons or less; 3. Discharges from establishments wherein the industrial wastewater discharge is less than two hundred gallons per day (gpd) and pretreatment is not required.
( Prior code § 25-29 ; Ord. 5105 § 2, 1996 ; Ord. 5268 § 3, 2001 )
Ask a question about Glendale law
Corpus searches the Glendale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
