§ 13.43.040 — Low impact development (LID) standards
Code of Ordinances, City of Glendale, California (Code 2026-05-19) · Glendale Code of Ordinances § 13.43.040
Corpus is an independent public-information project, not the official City of Glendale website. Stable reference: corpuslaw.us/code/a87b8f3e-73b9-41c7-bb08-c2b8e8726a32
§ 13.43.040: Low impact development (LID) standards.
A. The LID standards of this chapter: 1. Minimize the percentage of impervious surfaces on land developments by minimizing soil compaction during construction, designing projects to minimize the impervious area footprint, and employing low impact development (LID) design principles to mimic predevelopment hydrology through infiltration, evapotranspiration and rainfall harvest and use; 2. Prevent pollutants of concern from leaving the development site in stormwater as the result of storms, up to and including a water quality design storm event; and 3. Minimize hydromodification impacts to natural drainage systems. B. The director shall prepare, maintain, and update, as deemed necessary and appropriate, a manual ("LID Standards Manual"), which shall include urban and stormwater runoff quantity and quality control development principles and technologies for achieving compliance with the provisions of this section. The LID Standards Manual shall also include technical feasibility and implementation parameters, as well as other rules, requirements, and procedures as the director deems necessary, for implementing the provisions of this chapter. At the discretion of the director, LID Standards Manual may be referenced to the county of Los Angeles department of public works Low Impact Development Standards Manual latest edition. C. Designated Projects. To meet the standards described in subsection A of this section, development projects described in subsection A of Section 13.43.030 shall comply with the following requirements: 1. The project shall retain 100% of the stormwater quality design volume ("SWQDv") on-site, through infiltration, evapotranspiration, rainfall harvest and use, or a combination thereof, unless the director determines that it would be technically infeasible to do so; 2. If the director determines that it would be technically infeasible to retain 100% of the SWQDv on-site, the project shall comply with one of the following alternative compliance measures: a. The project shall provide for on-site biofiltration of one and one-half (1.5) times the portion of the SWQDv that is not retained on-site; b. The project shall include infiltration or bioretention BMPs to intercept the portion of the SWQDv that is not retained on-site at an off-site location, as approved by the director. The project shall also provide for treatment of the portion of the SWQDv discharged from the project site, as approved by the director; c. The project shall provide for the replenishment of groundwater supplies that have a designated beneficial use in the basin plan: i. Groundwater replenishment projects shall include infiltration, or bioretention BMPs to intercept the portion of the SWQDv that is not retained on-site at an off-site location, as approved by the director, ii. Groundwater replenishment projects shall also provide for treatment of the portion of the SWQDv discharged from the project site, as approved by the director; d. The project shall include infiltration, bioretention, or rainfall harvest and use BMPs to retrofit an existing development, with similar land uses as the project, to intercept the portion of the SWQDv that is not retained on-site; or e. The city, independently or in conjunction with one or more government entities, may apply to the Regional Water Board for approval of a regional or sub-regional stormwater mitigation program to substitute in part or wholly for the provisions of this chapter for the area covered by the regional or sub-regional stormwater mitigation program. If the Regional Water Quality Control Board approves the program, the provisions of the program shall apply in lieu of any conflicting provisions of this chapter. D. Non-Designated Projects. To meet the standards described in subsection A of this section, any development project described in subsection B of Section 13.43.030, shall comply with the following requirements: 1. A development project consisting of four or fewer residential units shall implement at least two LID BMP alternatives listed in the LID Standards Manual, which alternatives include, but are not limited to, disconnecting impervious surfaces, using porous pavement, downspout routing, a dry well, landscaping and irrigation requirements, and a green roof; 2. A development project consisting of five or more residential units, or a nonresidential development project, shall comply with the following requirements: a. The excess volume from each lot upon which such development is occurring shall be infiltrated at the lot level, or in the alternative, the excess volume from the entire development site, including streets and public right-of-way, shall be infiltrated in sub-regional facilities. The tributary area of a sub-regional facility shall be limited to five acres, but may be exceeded with approval of the director. When the director determines that infiltration of all excess volume is not technically feasible, on-site storage, reuse, or other water conservation uses of the excess volume is required and shall be implemented as authorized by the director in accordance with the requirements and provisions specified in the LID Standards Manual, and b. The runoff from the water quality design storm event associated with the developed site hydrology must be treated to the satisfaction of the director before discharge.
( Ord. 5857 § 23, 2015 )
Ask a question about Glendale law
Corpus searches the Glendale sections it holds and shows the ones that match, with their citations. Free, no sign-in.