§ 13.43.050 — Hydromodification control
Code of Ordinances, City of Glendale, California (Code 2026-05-19) · Glendale Code of Ordinances § 13.43.050
Corpus is an independent public-information project, not the official City of Glendale website. Stable reference: corpuslaw.us/code/2b2d8514-6e9f-4457-8dbb-ebe9e8e0ce39
§ 13.43.050: Hydromodification control.
A. Exemptions. The director may grant exemptions from the provisions of this section for the following types of development projects where the director determines that downstream channel conditions and proposed discharge hydrology indicate that adverse hydromodification effects to beneficial uses of natural drainage systems are unlikely: 1. The replacement, maintenance or repair of existing, publicly-maintained flood control facilities, storm drains, or transportation networks; 2. Redevelopment of a previously developed site in an urbanized area that does not increase the effective impervious area or decrease the infiltration capacity of pervious areas compared to the pre-project conditions; 3. Projects that have any increased discharge directly or through a storm drain to a sump, lake, area under tidal influence, into a waterway that has an estimated 100 year peak flow of 25,000 cubic feet per second ("c.f.s.") or more, or other receiving water that is not susceptible to hydromodification impacts; 4. Projects that discharge directly or through a storm drain into concrete or other engineered channels (e.g., channelized or armored with rip rap, shotcrete, etc.), which, in turn, discharge into receiving water that is not susceptible to hydromodification impacts; 5. Non-designated projects disturbing an area less than one acre or creating less than 10,000 square feet of new impervious area; or 6. Single-family homes that incorporate LID BMPs in accordance with the LID Standards Manual. B. The LID Standards Manual shall include hydromodification control development principles and technologies for achieving compliance with the provisions of this section as well as other rules, requirements and procedures as the director deems necessary, for implementing the provisions of this section. C. Unless excluded by subsection A, or excused pursuant to subsection D, development projects must fully mitigate off-site drainage impacts caused by hydromodification and changes in water quality, flow velocity, flow volume, and depth/width of flow, as determined by the director, in accordance with the requirements and provisions specified in the LID Standards Manual. 1. Sediment transport analysis shall be required when the project is tributary to any natural drainage system with a capital flood flow rate greater than 5,000 c.f.s. D. If the director determines that it would be infeasible for a development project to comply with the provisions of subsection C of this section, and the project disturbs an area less than 50 acres, written consent to the unmitigated impacts shall be obtained from the owner of every impacted downstream property. In addition, the development project shall comply with one of the following alternative requirements: 1. The project shall retain on-site, 100% of the stormwater volume from the runoff of the ninety-fifth (95th) percentile, 24 hour rainfall event, through infiltration, evapotranspiration, and/or harvest and use; 2. The runoff flow rate, volume, velocity, and duration for the project's post-development condition shall not exceed the pre-development condition for the two year, 24 hour rainfall event; or 3. The erosion potential ("Ep") in the receiving water channel shall approximate one, as demonstrated by a hydromodification analysis study approved by the director. E. If the director determines that it would be infeasible for a development project to comply with the provisions of subsection C of this section, and the project disturbs an area 50 acres or more, written consent to the unmitigated impacts shall be obtained from the owner of every impacted downstream property. In addition, the development project shall comply with one of the following alternative requirements: 1. The project shall infiltrate on-site at least the runoff from a two year, 24 hour rainfall event; 2. The runoff flow rate, volume, velocity, and duration for the project's post-development condition shall not exceed the pre-development condition for the two year, 24 hour rainfall events; or 3. The Ep in the receiving water channel shall approximate one, as demonstrated by a hydromodification analysis study approved by the director.
( Ord. 5857 § 24, 2015 )
Ask a question about Glendale law
Corpus searches the Glendale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
