§ 13.44.050 — LD-2—Determination of maximum demand—Calculation of bill
Code of Ordinances, City of Glendale, California (Code 2026-05-19) · Glendale Code of Ordinances § 13.44.050
Corpus is an independent public-information project, not the official City of Glendale website. Stable reference: corpuslaw.us/code/897aa0ca-42f3-4fbf-b017-85ec3d73d59b
§ 13.44.050: LD-2—Determination of maximum demand—Calculation of bill.
A. Glendale Water and Power shall determine maximum demand at its discretion by tests from time to time, or monthly by means of proper recording demand meters supplied, owned and maintained by Glendale Water and Power. Maximum demand shall mean the average demand in the 15 minute interval in which the average demand is greater than in any other 15 minute interval in the billing period. In cases where the energy demand is intermittent or subject to violent fluctuation, Glendale Water and Power may apply a shorter interval of time in the determination of the maximum demand. In cases where the energy demand is constant and not subject to fluctuation, Glendale Water and Power may at its discretion serve such a load without a meter and determine the maximum demand by test. The customer shall be responsible to notify Glendale Water and Power of any changes in load characteristics. Glendale Water and Power may, whenever it deems advisable, make tests to reestablish these load characteristics for use in billing. B. The demand charge for the LD-2 rate schedule shall be based on the maximum demand in kilowatts over the preceding 12 months.
( Ord. 5806 § 8, 2013 )
Ask a question about Glendale law
Corpus searches the Glendale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
