§ 10-12.19 — EFFECTIVE PRECIPITATION
Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 10-12.19
Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/22c15fc9-b59c-4153-9a89-d425722f5fc1
SEC. 10-12.19 - EFFECTIVE PRECIPITATION.
(a) A local agency may consider Effective Precipitation (25% of annual precipitation) in tracking water use and may use the following equation to calculate Maximum Applied Water Allowance: MAWA = (ETo - Eppt) (0.62) [(0.55 × LA) + (0.45 × SLA)] for residential areas. MAWA = (Eto - EPPT) (0.62) [(0.45 × LA) + (0.55 × SLA)] for non-residential areas. APPENDIX A. REFERENCE EVAPOTRANSPIRATION (ETo) TABLE* County and City | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual ETo ALAMEDA Fremont | 1.5 | 1.9 | 3.4 | 4.7 | 5.4 | 6.3 | 6.7 | 6.0 | 4.5 | 3.4 | 1.8 | 1.5 | 47.0 Livermore | 1.2 | 1.5 | 2.9 | 4.4 | 5.9 | 6.6 | 7.4 | 6.4 | 5.3 | 3.2 | 1.5 | 0.9 | 47.2 Oakland | 1.5 | 1.5 | 2.8 | 3.9 | 5.1 | 5.3 | 6.0 | 5.5 | 4.8 | 3.1 | 1.4 | 0.9 | 41.8 Oakland Foothills | 1.1 | 1.4 | 2.7 | 3.7 | 5.1 | 6.4 | 5.8 | 4.9 | 3.6 | 2.6 | 1.4 | 1.0 | 39.6 Pleasanton | 0.8 | 1.5 | 2.9 | 4.4 | 5.6 | 6.7 | 7.4 | 6.4 | 4.7 | 3.3 | 1.5 | 1.0 | 46.2 Union City** | 1.4 | 1.8 | 3.1 | 4.2 | 5.4 | 5.9 | 6.4 | 5.7 | 4.4 | 3.1 | 1.5 | 1.2 | 44.2 * The values in this table were derived from: 1) California Irrigation Management Information System (CIMIS); 2) Reference EvapoTranspiration Zones Map, UC Dept. of Land, Air & Water Resources and California Dept. of Water Resources 1999; and 3) Reference Evapotranspiration for California, University of California, Department of Agriculture and Natural Resources (1987) Bulletin 1922; 4) Determining Daily Reference Evapotranspiration, Cooperative Extension UC Division of Agriculture and Natural Resources (1987), Publication Leaflet 21426 **ETo of Union City shall be used for City of Hayward. APPENDIX B. WATER EFFICIENT LANDSCAPE WORKSHEET WATER EFFICIENT LANDSCAPE WORKSHEET This worksheet is filled out by the project applicant and it is a required element of the Landscape Documentation Package. City of Hayward Reference Evapotranspiration (ETo) 44.2 Hydrozone #/Planting Description a | Plant Factor (PF) | Irrigation Method b | Irrigation Efficiency (IE) c | ETAF (PF/IE) | Landscape Area (sq. ft.) | ETAF × Area | Estimated Total Water Use (ETWU) e Regular Landscape Areas Totals | (A) | (B) Special Landscape Areas 1 1 1 Totals | (C) | (D) ETWU Total Maximum Allowed Water Allowance (MAWA) e a Hydrozone #/Planting Description e.g 1.) front lawn 2.) low water use plantings 3.) medium water use planting b Irrigation Method overhead spray or drip or drip c Irrigation Efficiency 0.75 for spray head 0.81 for drip d ETWU (Annual Gallons Required) = Eto × 0.62 × ETAF × Area where 0.62 is a conversion factor that converts acre-inches per acre per year to gallons per square foot per year. e MAWA (Annual Gallons Allowed) = (Eto) (0.62) [(ETAF × LA) + ((1-ETAF) × SLA)] where 0.62 is a conversion factor that converts acre-inches per acre per year to gallons per square foot per year, LA is the total landscape area in square feet, SLA is the total special landscape area in square feet, and ETAF is .55 for residential areas and 0.45 for non-residential areas. ETAF Calculations All Landscape Areas Total ETAF × Area | (B+D) Total Area | (A+C) Sitewide ETAF | (B+D) ÷ (A+C) Regular Landscape Area Total ETAF × Area | (B) Total Area | (A) Sitewide ETAF | B ÷ A Average ETAF for Regular Landscape Areas must be 0.55 or below for residential areas and 0.45 or below for non-residential areas. APPENDIX C. CERTIFICATE OF COMPLETION PART 1. CERTIFICATE OF COMPLETION This certificate is filled out by the project applicant upon completion of the landscape project. [image omitted; see the official code] PART 2. CERTIFICATION OF INSTALLATION [image omitted; see the official code] PART 3. IRRIGATION SCHEDULING Attach parameters for setting the irrigation schedule on controller per ordinance Section 10.12-08. PART 4. SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE Attach schedule of Landscape and Irrigation Maintenance per ordinance Section 10.12-10. PART 5. LANDSCAPE IRRIGATION AUDIT REPORT Attach Landscape Irrigation Audit Report per ordinance Section 10-12.11. PART 6. SOIL MANAGEMENT REPORT Attach soil analysis report, if not previously submitted with the Landscape Documentation Package per ordinance Section 10-12.07. Attach documentation verifying implementation of recommendations from soil analysis report per ordinance Section 10-12-06. PART 7. LANDFILL DIVERSION VERIFICATION Attach Landfill Diversion Verification Statement per ordinance Section 10-12.07. [image omitted; see the official code] APPENDIX D. PRESCRIPTIVE COMPLIANCE OPTION (a) This appendix contains prescriptive requirements which may be used as a compliance option to the Model Water Efficient Landscape Ordinance. (b) Compliance with the following items is mandatory and must be documented on a landscape plan in order to use the prescriptive compliance option: (1) Submit a Landscape Documentation Package which includes the following elements: (A) date (B) project applicant (C) project address (if available, parcel and/or lot number(s)) (D) total landscape area (square feet), including a breakdown of turf and plant material (E) project type (e.g., new, rehabilitated, public, private, cemetery, homeowner-installed) (F) water supply type (e.g., potable, recycled, well) and identify the local retail water purveyor if the applicant is not served by a private well (G) contact information for the project applicant and property owner (H) applicant signature and date with statement, "I agree to comply with the requirements of the prescriptive compliance option to the MWELO". (2) Incorporate compost at a rate of at least four cubic yards per 1,000 square feet to a depth of six (6) inches into landscape area (unless contra-indicated by a soil test). (3) Plant material shall comply with all of the following: (A) For residential areas, install climate adapted and native plants that require occasional, little or no summer water (average WUCOLS plant factor 0.3) for seventy five percent (75%) of the plant area excluding edibles and areas using recycled water; For non-residential areas, install climate adapted and native plants that require occasional, little or no summer water (average WUCOLS plant factor 0.3) for 100% of the plant area excluding edibles and areas using recycled water; (B) A minimum three inch (3″) layer of mulch shall be applied on all exposed soil surfaces of planting areas except in turf areas, groundcover areas receiving closely spaced grass plugs as a lawn alternative, or direct seeding applications where mulch is contraindicated. (4) Turf shall comply with all of the following: (A) Turf shall not exceed twenty five percent (25%) of the landscape area in residential areas, and there shall be no turf in non-residential areas; (B) Turf shall not be planted on sloped areas which exceed twenty five percent (25%), a slope of one (1) foot vertical elevation change for every four (4) feet of horizontal length; and (C) Turf is prohibited in parkways less than ten feet (10') wide, unless the parkway is adjacent to a parking strip and used to enter and exit vehicles. Any turf in parkways must be irrigated by sub-surface irrigation or by other technology that creates no overspray or runoff. (5) Irrigation systems shall comply with the following: (A) Automatic irrigation controllers are required and must use evapotranspiration or soil moisture sensor data and utilize a rain sensor. (B) Irrigation controllers shall be of a type which does not lose programming data in the event the primary power source is interrupted. (C) Pressure regulators shall be installed on the irrigation system to ensure the dynamic pressure of the system is within the manufacturers recommended pressure range. (D) Manual shut-off valves (such as a gate valve, ball valve, or butterfly valve) shall be installed as close as possible to the point of connection of the water supply. (E) All irrigation emission devices must meet the requirements set in the ANSI standard, ASABE/ICC 802-2014. "Landscape Irrigation Sprinkler and Emitter Standard," All sprinkler heads installed in the landscape must document a distribution uniformity low quarter of 0.65 or higher using the protocol defined in ASABE/ICC 802-2014. (F) Areas less than ten feet (10') in width in any direction shall be irrigated with subsurface irrigation or other means that produces no runoff or overspray. (6) For non-residential projects with landscape areas of 1,000 square feet or more, a dedicated irrigation water service meter shall be installed. (7) Alameda County law prohibits disposal of plant debris in county landfills. ACWMA Plant Debris Landfill Ban Ordinance 2008-01 requires landscape professionals, to separate all plant debris from garbage. http://www.recyclingrulesac.org/docs/Landfill-Ban-WMA-Ordinance2008-01.pdf (c) At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion, certificate of installation, irrigation schedule and a schedule of landscape and irrigation maintenance.
Ask a question about Hayward law
Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.
