For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-3.259 — TESTS

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 11-3.259

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/6d6c4318-78aa-44bf-8fc0-84acaf10abff

SEC. 11-3.259 - TESTS.

Upon completion of the work, the City Engineer may require the house sewer to be subjected to appropriate tests, such as a water test or video test/inspection. The pressure for a water test shall be that imposed by a five (5) foot head of water. The house sewer shall be plugged before test at a point just before conversion is made to public sewer or place of disposal. Under test the water pressure shall remain constant for not less than fifteen (15) minutes without any further addition of water or indication of leaks. The video camera and recording equipment used for video testing shall be suitable for the intended purpose and shall be equipment that is in common use at the time of the test. A complete and continuous taped record and written log of the inspection shall be made. The taped record shall be of such quality as to provide a clear, sharp image when played back on a conventional television set. The taped record shall conform to the Owner's video recorder requirements. The image shall show sufficient detail to determine cracks in the pipe, offset joints, leaking joints, and other flaws in the installation of the sewer main. The video taping shall be done with no flow in the sewer.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.