For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-3.350 — BUILDING COURT MAIN SEWER

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 11-3.350

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/36ce13e7-2235-4963-bb4f-ff3f5c976cb9

SEC. 11-3.350 - BUILDING COURT MAIN SEWER.

A building court main sewer shall be not less than eight (8) inches in diameter and shall be laid at uniform grade and in straight alignment; a standard manhole shall be installed at the end of all building court mains. A building court main serving not more than ten dwelling units or the equivalent shall be connected to the public sewer at a wye branch and may be laid at a minimum slope of .006 feet per foot. Manholes shall be installed per City Standard Details. A building court main serving more than ten dwelling units or the equivalent may be laid at a minimum slope of .004 feet per foot. Manholes shall be installed in the following locations: (1) At the connection to the public sewer; (2) At any change in direction or grade; and (3) At intervals not to exceed four hundred (400) feet. Two sets of drawings prepared by a Registered Civil Engineer showing plan and profile of the proposed installation shall be submitted for approval. Grades for building court main sewers shall be staked by a Licensed Land Surveyor or Registered Civil Engineer, authorized to practice land surveying in the State of California, in accordance with the approved drawings. Building court house sewers shall meet the requirements for house sewers.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.