§ 11-3.359 — BUILDING SEWER CONNECTION TO PUBLIC SEWER

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 11-3.359

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/560105f7-f237-4d4d-9346-9dc9a1de3e4a

SEC. 11-3.359 - BUILDING SEWER CONNECTION TO PUBLIC SEWER.

The connection of the building sewer into the public sewer shall be made in the following manner: If the diameter of the building sewer is equal to the diameter of the public sewer, connection shall be made at a wye branch in the public sewer at a location specified by the City Engineer. When the diameter of the building sewer is less than the diameter of the public sewer and no properly located wye branch is available, a neat hole may be cut into the public sewer to receive the building sewer and shall be fitted with a special saddle connection. The saddle connection shall be equipped with complete annular shoulder to prevent it from slipping into the public sewer; it shall protrude into the wall, but shall not exceed past the inner surface of the public sewer. The saddle adapter shall be securely fastened in place by a minimum of four (4) complete turns of ten-gauge galvanized iron or copper wire wrapped entirely around the saddle and the public sewer. A smooth neat joint shall be made and the annular space between the spigot of the saddle and the edges of the hole in the public sewer shall be filled with cement mortar, and the entire connection made secure and watertight by encasement in concrete. Other special fittings may be used for connection only when approved by the City Engineer. The top of pipe of the building sewer at the point of connection shall be at the same or at a higher elevation than the top of pipe of the public sewer. EXCEPTION. Interceptor sewers of reinforced concrete pipe eighteen (18) inches or larger in diameter may not have direct connections. The building sewer shall then be connected to an eight (8) inch main laid parallel to the interceptor and connected at the nearest manhole. The portion of the building sewer in the street shall be at right angles to the right of way lines and at least three (3) feet below the curb grade. Provided that when it is necessary to install a building sewer in the street less than three (3) feet below the curb grade, the same must be covered with at least six (6) inches of concrete to protect the same from breakage, or shall be of cast iron pipe. The applicant for the building sewer permit shall notify the City Engineer when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the City Engineer.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.