For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-3.356 — ELEVATION—BUILDING SEWER

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 11-3.356

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/6c73b740-a86e-479e-b228-64da84a28699

SEC. 11-3.356 - ELEVATION—BUILDING SEWER.

Whenever possible the building sewer shall be brought to the building at an elevation below the lowest floor being served. No building sewer shall be laid parallel and within the soil bearing area of the footing of any bearing wall which might be weakened thereby. The depth shall be sufficient to afford a minimum of thirty (30) inch cover for non-metallic pipe. The building sewer shall be laid at uniform grade and in straight alignment. Where direct alignment is not practical, one change in alignment not to exceed twenty-two and one-half (22½) degrees may be made in the portion of the house sewer within the lot boundaries. Approved curved pipe and fittings shall be used. Any additional change in alignment shall be served by a cleanout.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.