For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-4.90 — DUTIES OF THE FLOOD PLAIN ADMINISTRATOR

Hayward Municipal Code (Supp. No. 28, Update 2: codified through Ordinance No. 26-08, adopted August 18, 2026) · Hayward Municipal Code § 9-4.90

Corpus is an independent public-information project, not the official City of Hayward website. Stable reference: corpuslaw.us/code/c94fbadb-6813-4315-9129-72351423c4bb

SEC. 9-4.90 - DUTIES OF THE FLOOD PLAIN ADMINISTRATOR.

The duties and responsibilities of the Flood Plain Administrator include, but are not limited to: (a) Permit review. The Flood Plain Administrator shall review all development permits pertaining to properties in the flood plain, to determine the following: (1) Compliance with this article's requirements. (2) That required state and federal permits have been obtained. (3) That the site is reasonably safe from flooding. (4) That the proposed development does not adversely affect the carrying capacity of areas where the base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one (1) foot at any point within the City of Hayward; and (5) All Letters of Map Revision (LOMR's) for flood control projects are approved prior to the issuance of building permits. Building Permits must not be issued based on Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. (b) Development of Substantial Improvement and Substantial Damage Procedures. (1) Using FEMA publication FEMA 213, "Answers to Questions About Substantially Damaged Buildings," develop detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining "Market Value." (2) Assure procedures are coordinated with other department/divisions and implemented by community staff. (c) Review, Use, and Development of Other Base Flood Data. (1) When base flood elevation data has not been provided in accordance with Section 9-4.30, the Flood Plain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal or state agency or other source, deemed necessary to administer Sections 9-4.110 through 9-4.160. (2) A base flood elevation may be obtained using one (1) of two (2) methods from the FEMA publication, FEMA 265, "Managing Floodplain Development in Approximate Zone A Areas - A Guide for Obtaining and Developing Base (100 year) Flood Elevations," dated July 1995. (d) Notification of Other Agencies. When a watercourse is to be altered or relocated, the Flood Plain Administrator shall also: (1) Notify adjacent communities and the California Department of Water Resources prior to such alteration or relocation of a watercourse, and submit evidence of such notification to the Federal Insurance Administration, Federal Emergency Management Agency; and (2) Require that the flood carrying capacity of the altered or relocated portion of said watercourse is maintained. (3) Base Flood Elevation changes due to physical alterations: a) Within six (6) months of information becoming available or project completion, whichever comes first, the flood plain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a Letter of Map Revisions (LOMR). b) All LOMR's for flood control projects are approved prior to the issuance of building permits. Building Permits must not be issued based on Conditional Letters of Map Revision (CLOMR's). Approved CLOMR's allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and flood plain management requirements are based on current data. (4) Changes in corporate boundaries: Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits. (e) Documentation of Flood Plain Development. The Flood Plain Administrator shall also obtain, maintain, and make available for public inspection the following: (1) Certification required by subdivisions 9-4.110(c)(1), (lowest floor elevations); (2) Certification required by subdivision 9-4.110(c)(2), (elevation of floodproofing of nonresidential structures); (3) Certification required by subdivision 9-1.110(c)(3), (wet floodproofing standards); (4) Certification of elevation required by subdivision 9-4.130(b), which contains subdivision standards; (5) Certification required by subdivision 9-4.160(a), (floodway encroachments); (6) Information required in subdivision 9-4.170(f), (coastal construction standards); (7) Maintain a record of all variance actions, including justification for their issuance, and report such variances issued in its biennial report submitted to the Federal Emergency Management Agency. (f) Map Determinations. The Flood Plain Administrator is also authorized to make determinations and interpretations as to the exact location of the boundaries of the areas of special flood hazard. Where there appears to be a conflict between a mapped boundary and actual field conditions, grade and base flood elevations shall be used to determine the boundaries of the special flood hazard area. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal an interpretation made pursuant to Section 9-4.180. (g) Remedial Action. The Flood Plain Administrator also has the discretion to take action to remedy violations of this article pursuant to Section 9-4.40. (h) Biennial Report. Complete and submit Biennial Report to FEMA. (i) Planning. Assure community's General Plan is consistent with floodplain management objectives herein.

Ask a question about Hayward law

Corpus searches the Hayward sections it holds and shows the ones that match, with their citations. Free, no sign-in.