§ 9.275.050 — Application for permit
Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 9.275.050
Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/b953d742-6b2b-4d6c-8c99-c20abb662916
Sec. 9.275.050. - Application for permit.
A. Application content. All applications for a permit required by this chapter must be made in writing on such form as the Director prescribes, which shall include the following information, in addition to all other information determined necessary by the Director as well as all other information required by the city as part of an application for a conditional use permit: (1) Full name and contact information for the facility owner, facility operator, agent (if any), and property owner, and related letter(s) of authorization. (2) Preliminary title report that is within thirty (30) days of application submittal. (3) The type of facility, including a full written description of the proposed facility, its purpose and specifications. (4) A detailed site and engineering plan of the proposed facility prepared by a qualified licensed engineer and in accordance with requirements set by the Director. Site plan shall, at minimum, include the exact location of the facility, including panels, microwave dishes, antennas, any other structures, existing improvements, property lines, easements, utilities, setbacks from structures to property lines, access, and parking spaces. (5) A conceptual grading plan, with topographic map, showing existing features within two hundred (200) feet beyond site boundaries, is required with proposed grading or drainage changes. (6) Photographs of facility equipment and an accurate visual impact analysis with photo simulations; including but not limited to an accurate visual impact analysis showing the maximum silhouette, viewshed analysis, color and finish palette and proposed screening for the wireless communications facility. The analysis shall include photo simulations and other information as necessary to determine visual impact of the wireless communications facility. A map depicting where the photos were taken shall be included. The analysis shall include a written description of efforts to blend the wireless communications facility with the surrounding area; he height and mass of the facility, together with evidence that demonstrates that the proposed wireless communications facility has been designed to the minimum height and mass required from a technological standpoint for the proposed site. (7) An alternative configuration analysis, assessing the feasibility of alternative wireless communications facility construction configurations, both at the proposed site and in the surrounding vicinity, which would result in a more visually compatible antenna(s), as deemed necessary by the Director. This analysis shall include an explanation of why other wireless communications facility construction configurations were not selected. (8) A description of the maintenance and monitoring program for site, wireless communications facility, associated improvements and landscaping. (9) Completion of a RF exposure guidelines checklist, and proof of all applicable licenses or other approvals required by the FCC and an engineering certification demonstrating planned compliance with all existing federal radio frequency emissions standards, and indicating: (i) existing base level radio frequency radiation; (ii) the maximum radio frequency radiation; (iii) the effective radiated power per channel; and (iv) the total number of channels for an omnidirectional antenna or the maximum number of channels in any sector for a sectored antenna at the proposed site. (10) If the application is for a facility that will be located within the public right-of-way, the applicant shall certify that it is a telephone corporation or state the basis for its claimed right to enter the right-of-way, and provide a copy of its certificate of public convenience and necessity (CPCN), if a CPCN has been issued by the California Public Utilities Commission. (11) A projection of the applicant's anticipated future wireless communications facility siting needs within the city, which information may be used by the city as part of a master planning effort designed to ensure a planned, integrated and organized approach to wireless communications facility siting. (12) A written report that analyzes acoustic levels for the proposed wireless communication facility and all associated equipment including, without limitation, all environmental control units, sump pumps, temporary backup power generators, and permanent backup power generators in order to demonstrate compliance with Chapter 11.05, (Noise Regulations). The acoustic analysis must be prepared and certified by an engineer and include an analysis of the manufacturers' specifications for all noise-emitting equipment and a depiction of the proposed equipment relative to all adjacent property lines. In lieu of a written report, the applicant may submit evidence from the equipment manufacturer that the ambient noise emitted from all the proposed equipment will not, both individually and cumulatively, exceed the applicable limits. (13) A conceptual landscape plan shall show the following: (a) Conceptual location of plants including all proposed landscaping, concealment, screening and proposed irrigation with a discussion of how the chosen material at maturity will screen the site. The written discussion may be provided in a separate letter. (b) The quantity, size, and species of plants shall be included on the plan. (c) Planting legend. (d) Hardscape, sidewalk, trails or similar elements. (e) Walls or fences with details of height, location, and materials. (f) Any proposed or existing structures, including wireless communication facility, consistent with the site plan. Show roof outlines, including eave overhang. (g) Line of sight. (h) Common or public open space/recreation areas. (i) Landscape plans shall be prepared by a botanist, licensed landscape contractor, or licensed landscape architect. (14) A written description of any good faith efforts to co-locate the proposed wireless communications facility on another site or building, including a map of the sites and engineering information or letters from the owners of the site describing why co-location is not a possibility. (15) A written description of all accessory wireless equipment for the wireless communications facility, including an explanation of the function of this ancillary equipment and the need to locate same on or near the wireless communications facility. (16) All other information as required by the city's wireless communications facility supplemental application form, which may be modified from time to time at the discretion of the Community Development Director. (17) If the applicant claims it requires an exception to the requirements of this chapter, all information and studies necessary for the city to evaluate that claim. (18) An application and processing fee and a deposit for a consultant review as set forth in subsection B of this section. (19) Any other studies or information determined necessary by the Director may be required. B. Independent expert. (1) The Director is authorized to retain on behalf of the city an independent, qualified consultant to review any application for a permit for a wireless communication facility to review the technical aspects of the application, including, but not limited to, the following matters: (a) The accuracy, adequacy, and completeness of submissions; (b) Compliance with applicable radio frequency emission standards; (c) Whether any requested exception is necessary to close a significant gap in coverage and is the least intrusive means of doing so: (d) Technical demonstration of the unavailability of alternative sites, facility designs or configurations, and coverage analysis; (e) The validity of conclusions reached or claims made by applicant; (f) Height analysis; (g) Configuration; and (h) Any specific technical issues designated by the city. (2) The cost of this review shall be paid by the applicant through a deposit pursuant to an adopted fee schedule resolution.
(Ord. No. 2025-21, § 3(Exh. A), 10-2-2025)
Ask a question about Jurupa Valley law
Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.
