§ 9.275.080 — Conditions of approval for all facilities
Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 9.275.080
Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/82564778-2249-423b-8ee1-cc8ffa3a7078
Sec. 9.275.080. - Conditions of approval for all facilities.
A. In addition to compliance with the requirements of this chapter, upon approval, all facilities shall be subject to each of the following conditions of approval; (1) Before the permittee submits any application for a building permit or other permits required by the Jurupa Valley Municipal Code, the permittee must incorporate the permit granted under this chapter, all conditions associated with the permit and the approved plans and any photo simulations (the "approved plans") onto the project plans. The permittee must construct, install and operate the wireless communication facility in strict compliance with the approved plans. (2) The permittee shall submit and maintain current contact and site information on a form to be supplied by the city. The permittee shall notify the city of any changes to the information submitted within seven (7) days of any change, including change of the name or legal status of the owner or operator. This information shall include, but is not limited to, the following: (a) Identity, including the name, address and twenty-four-hour local or toll-free contact phone number of the permittee, the owner, the operator, and the agent or person responsible for the maintenance of the facility. (b) The legal status of the owner of the wireless communication facility, including official identification numbers and FCC certification. (c) Name, address, and telephone number of the property owner if different than the permittee. (3) The permittee shall not place any facilities that will deny access to, or otherwise interfere with, any public utility, easement, or right-of-way located on the site. The permittee shall allow the city reasonable access to, and maintenance of, all utilities and existing public improvements within or adjacent to the site, including, but not limited to, pavement, trees, public utilities, lighting and public signage. (4) At all times, all required notices and signs shall be posted on the site as required by the FCC and California Public Utilities Commission, and as approved by the city. Each wireless communications facility shall be identified by a permanently installed plaque or marker, no larger than four (4) inches by six (6) inches, clearly identifying the addresses, email contact information, and twenty-four-hour local or toll-free contact telephone numbers for a live contact person for both the permittee and the agent responsible for the maintenance of the wireless communications facility. Emergency contact information shall be included for immediate responses. Such information shall be updated in the event of a change in the permittee, the agent responsible for maintenance of the wireless communications facility, or both. The location and dimensions of a sign bearing the emergency contact name and telephone number shall be posted pursuant to the approved plans. (5) At all times, the permittee shall ensure that the facility complies with the most current regulatory and operational standards including, but not limited to, radio frequency emissions standards adopted by the FCC and antenna height standards adopted by the Federal Aviation Administration. (a) Prior to the final inspection for the construction of a wireless communications facility, which contains transmitting antenna(s), except in relation to amateur ham radio antenna(s) and transmitting antenna(s) with an effective radiated power (ERP) of five (5) watts or less per channel, the maximum radio frequency radiation shall be measured and documented in a written report submitted to the city. The maximum radio frequency radiation shall not exceed the most current FCC safety standards. The measurement and report shall be performed and prepared by a qualified, independent testing service/consultant retained by the city at the applicant's expense. The measurement shall be made utilizing the most current testing protocol established by the FCC. (b) In order to guarantee long-term compliance with conditions of approval, that power levels remain as specified, and that the equipment is operating as designed, the operator of an approved transmitting antenna shall submit an affidavit indicating that the wireless communications facility is operating as approved and that the facility complies with the most current FCC Safety Standards. The affidavit shall be submitted on a yearly basis prior to the anniversary date of when the building permit was finaled as long as the facility remains in operation and shall incorporate a separate affidavit of a qualified, independent testing service/consultant demonstrating and verifying compliance with the most current FCC Safety Standards and approved power levels. In addition, the city may conduct independent tests to verify compliance with the most current FCC Safety Standards and approved power levels. The Director or designee shall periodically review the approved wireless communications facility sites and determine if testing is necessary. Approved wireless communications facility providers shall be notified of all such Director determinations. The operator(s) of the approved wireless communications facility shall be responsible for the full cost of such tests. Failure to comply with this condition of approval (or any condition of approval) shall be considered cause for revocation of the wireless communication facility approval. (c) If the Director determines there is good cause to believe that the facility may emit radio frequency emissions that are likely to exceed FCC standards, the Director may require the permittee to submit a technically sufficient written report certified by a qualified radio frequency emissions engineer, certifying that the facility is In compliance with such FCC standards. The operator(s) of the approved wireless communications facility shall be responsible for the full cost of the review of the written report. (8) Prior to the issuance of any building permit, permittee shall pay for and provide a performance bond, which shall be in effect until the facilities are fully and completely removed and the site reasonably returned to its original condition, to cover permittee's obligations under these conditions of approval and the Jurupa Valley Municipal Code. The bond coverage shall include, but not be limited to, removal of the facility, maintenance obligations and landscaping obligations. The amount of the performance bond shall be set by the Director in an amount rationally related to the obligations covered by the bond and shall be specified in the conditions of approval. (9) Permittee shall defend, indemnify, protect and hold harmless the city, its elected and appointed Council members, boards, commissions, officers, officials, agents, consultants, employees, and volunteers from and against any and all claims, actions, or proceeding against the city and its elected and appointed Council members, boards, commissions, officers, officials, agents, consultants, employees and volunteers to attack, set aside, void or annul, an approval of the city, Planning Commission or City Council concerning this permit and the project. Such indemnification shall include damages, judgments, settlements, penalties, fines, defensive costs or expenses, including, but not limited to, interest, attorneys' fees and expert witness fees, or liability of any kind related to or arising from such claim, action, or proceeding. The city shall promptly notify the permittee of any claim, action, or proceeding. Nothing contained herein shall prohibit city from participating in a defense of any claim, action or proceeding. The city shall have the option of coordinating the defense, including, but not limited to, choosing counsel for the defense at permittee's expense. (10) All conditions of approval shall be binding as to the applicant and all successors in interest to permittee. (11) A condition setting forth the permit expiration date in accordance with Section 9.275.190 shall be included in the conditions of approval. (12) Maintenance. The project site and all structures shall be maintained in good condition and shall be kept free of debris, weeds, abandoned vehicles, code violations, and any other factor or condition that may contribute to potential blight or crime. (a) All graffiti on any components of the wireless communications facility shall be removed promptly in accordance with city regulations. Graffiti on any facility must be removed within twenty-four (24) hours of notification. (b) All landscaped areas shall be maintained as approved on the final landscape plans in an orderly, attractive and healthy condition. This shall include proper pruning, mowing of turf areas, weeding, removal of litter, fertilization, replacement of plants when necessary, and the regular application of appropriate quantities of water to all landscaped areas. Irrigation systems shall be maintained as approved on the final landscape and irrigation plans in proper operating condition. Waterline breaks, head/emitter ruptures, overspray or runoff conditions and other irrigation system failures shall be repaired immediately. The canopy trees shall be maintained in a manner that they provide the required shade coverage and encourage the canopy to grow to provide shade. Avoid topping trees or pruning the trees in a manner that the trees do not achieve mature height and form. (c) If a flagpole is used for camouflaging a wireless communications facility, flags shall be flown and shall be properly maintained at all times. The use of the United States flag is subject to the provisions of the United States Flag Code, 4 U.S.C. § 6 et seq. (d) All wireless communications facility sites shall be kept clean and free of litter. (e) All equipment cabinets shall display a legible sign clearly identifying the address, email contact information, and twenty-four-hour local or toll-free contact telephone numbers for both the permittee and the agent responsible for the maintenance of the wireless communications facility. Such information shall be updated in the event of a change in the permittee, the agent responsible for maintenance of the wireless communications facility, or both. (f) All wireless communication facilities shall be continually maintained by repainting when faded. Any facility with faux foliage will be required to replace damaged or faded faux foliage.
(Ord. No. 2025-21, § 3(Exh. A), 10-2-2025)
Ask a question about Jurupa Valley law
Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.
