For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.283.040 — Landscape documentation requirements

Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 9.283.040

Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/ed4cedbe-bc9c-49c1-a77f-efde7de5f7e4

Sec. 9.283.040. - Landscape documentation requirements.

A. An applicant proposing any new or rehabilitated landscape for a project subject to Section 9.283.030 of this chapter shall prepare and submit to the Community Development Director documentation that includes the following: (1) Project information; (2) A planting plan; (3) An irrigation design plan; (4) A soil management plan; (5) A grading design plan; and (6) The Model Water Efficient Landscape Worksheet. B. The most recent "Riverside County Guide to California Friendly Landscaping" (Landscaping Guide) is hereby incorporated by reference to assist in designing, constructing and maintaining a water efficient landscape and efficient irrigation system. C. It is recommended that an applicant proposing any new or rehabilitated landscape that is designated for recycled water use consult with the appropriate local water purveyor early in the development review process to ensure that future recycled water facilities meet the projected demand and that the aforementioned plans, when submitted, comply with the applicable standards, approvals and implementation requirements of this chapter, the local water purveyor and any applicable maintenance entity. D. Water systems for common open space areas shall use non-potable water if approved facilities are made available by the local water purveyor. Provisions for a non-potable water system shall be provided within the irrigation design plan. Water systems designed to utilize non-potable water shall be designed to meet all applicable standards of the applicable Regional Water Quality Control Board and the Riverside County Health Department. Prior to construction, the project applicant shall submit a landscape documentation package to the local agency. E. Project information. The following items shall be submitted as part of the landscape documentation: (1) Date; (2) Name of applicant and contact information; (3) Name of project owner and contact information; (4) Project address including parcel and lot numbers; (5) Total landscape area in square feet; (6) Project type (e.g. new or rehabilitated, and residential, commercial, or industrial); (7) Water supply (e.g. potable, well, recycled; use of recycled water is encouraged); (8) Applicant's signature and date with statement, "I agree to comply with the requirements of Chapter 9.283 of Title 9 of the Jurupa Valley Municipal Code and submit a complete Landscape Documentation Package." F. Landscape planting plan requirements. (1) Plant types shall be grouped together in regards to their water, soil, sun and shade requirements and in relationship to the buildings. Plants with different water needs shall be irrigated separately. Plants with the following classifications shall be grouped accordingly: high and moderate, moderate and low, low and very low. Deviation from these groupings shall be not be permitted. (2) Trees for shade shall be provided for residential, commercial and industrial buildings, parking lots and open space areas per the requirements in the Jurupa Valley Zoning Ordinance. These trees can be deciduous or evergreen and are to be incorporated to provide natural cooling opportunities for the purpose of energy and water conservation. (3) Plants shall be placed in a manner considerate of solar orientation to maximize summer shade and winter solar gain. (4) Plant selection for projects in high fire hazard areas shall address fire safety and prevention. A defensible space or zone around a building or structure is required pursuant to Pub. Resources Code Section 4291 and County Ordinance No. 695, as adopted by the city of Jurupa Valley pursuant to Chapter 1.35 of the Jurupa Valley Municipal Code. Fire-prone plant materials and highly flammable mulches shall be avoided. Refer to the local Fuel Modification Plan guidelines. (5) Invasive species of plants such as those listed by the California Invasive Plant Council, shall be avoided especially near parks, buffers, greenbelts, water bodies, conservation areas/reserves and other open space areas because of their potential to cause harm to environmentally sensitive areas. (6) Soil preparation. (a) Prior to the planting of any materials, compacted soils shall be transformed to a friable condition. On engineered slopes, only amended planting holes need meet this requirement. (b) Soil amendments shall be incorporated according to recommendations of the soil report and what is appropriate for the plants selected (see Section 9.283.040(H)). (c) Soil polymers are recommended as a soil amendment as they absorb water and nutrients, increase air space in the soil and can reduce watering by half. (d) For landscape installations, compost at a rate of a minimum of four cubic yards per one thousand (1,000) square feet of permeable area shall be incorporated to a depth of six (6) inches into the soil. (e) Soils with greater than six (6) percent organic matter in the top six (6) inches of soil are exempt from adding compost and tilling. (7) All exposed surfaces of non-turf areas within the developed landscape area shall be mulched with a minimum three (3) inch layer of material, except in areas with groundcover planted from flats where mulch depth shall be one and one-half inches (1½"). (8) Stabilizing mulching products shall be used on slopes. (9) Turf areas shall be used in response to functional needs and in compliance with the water budget. (10) Decorative water features shall use re-circulating water systems. (11) Where available, recycled water shall be used as the source for irrigation and decorative water features. (12) Planting plans shall identify and site the following: (a) New and existing trees, shrubs, ground covers, and turf areas within the proposed landscaped area; (b) A planting legend indicating all plant species by botanical name and common name, spacing, and quantities of each type of plant by container size; (c) Designation of hydrozones; (d) Area, in square feet, devoted to landscaping and a breakdown of the total area by landscape hydrozones; (e) Property lines, streets, and street names; (f) Building locations, driveways, sidewalks, retaining walls, and other hardscape features; (g) Appropriate scale and north arrow; (h) Any special landscape areas; (i) Type of mulch and application depth; (j) Type and surface area of water features; (k) Type installation details, and 24-hour retention or infiltration capacity of any applicable stormwater best management practices. Project applicants shall refer to the local agency or regional Water Quality Control Board for information on any applicable stormwater technical requirements; and (l) Planting specifications and details, including the recommendations from the soils analysis, if applicable. (13) Planting Plans shall include the Water Efficient Landscape Worksheet in Appendix B of the Department of Water Resources Model Water Efficient Landscape Ordinance, adopted herein by this reference, that contains information on the plant factor, irrigation method, irrigation efficiency, and area associated with each hydrozone for calculating the maximum applied water allowance and the estimated annual water use. (a) Calculations must show that the evapotranspiration adjustment factor (ETAF) for the landscape project does not exceed a factor of 0.55 for residential areas and 0.45 for non-residential areas, exclusive of special landscape areas. The ETAF for a landscape project is based on the plant factors and irrigation methods selected. The maximum applied water allowance is calculated based on the maximum ETAF allowed (0.55 for residential areas and 0.45 for non-residential areas) and expressed as annual gallons required. The Estimated Total Water Use (ETWU) is calculated based on the plants used and irrigation method selected for the landscape design. ETWU must be below the MAWA. (b) In calculating the Maximum Applied Water Allowance and Estimated Total Water Use, a project applicant shall use the ETo values from the Reference Evapotranspiration Table in Appendix A of the Department of Water Resources Model Water Efficient Landscape Ordinance, adopted by the Department of Water Resources, adopted herein by this reference. (c) Water budget calculations shall adhere to the following requirements: (i) The plant factor used shall be from WUCOLS or from horticultural researchers with academic institutions or professional associations as approved by the California Department of Water Resources (DWR). The plant factor ranges from 0 to 0.1 for very low water using plants, 0.1 to 0.3 for low water use plants, from 0.4 to 0.6 for moderate water use plants, and from 0.7 to 1.0 for high water use plants. (ii) All water features shall be included in the high water use hydrozone and temporarily irrigated areas shall be included in the low water use hydrozone. (iii) All Special Landscape Areas shall be identified and their water use calculated per Appendix B of the Department of Water Resources Model Water Efficient Landscape Ordinance. (iv) ETAF for new and existing (non-rehabilitated) Special Landscape Areas shall not exceed 1.0. (14) Planting plans and irrigation plans (Section 9.283.040(G)) shall be drawn at the same size and scale. (15) The planting plan shall be prepared by a Landscape Architect licensed by the State of California. G. Water Efficient Landscape Worksheet. (1) A project applicant shall complete the Water Efficient Landscape Worksheet in Appendix A which contains information on the plant factor, irrigation method, irrigation efficiency, and area associated with each hydrozone. Calculations are then made to show that the evapotranspiration adjustment factor (ETAF) for the landscape project does not exceed a factor of 0.55 for residential areas and 0.45 for non-residential areas, exclusive of Special Landscape Areas. The ETAF for a landscape project is based on the plant factors and irrigation methods selected. The Maximum Applied Water Allowance is calculated based on the maximum ETAF allowed (0.55 for residential areas and 0.45 for non-residential areas) and expressed as annual gallons required. The Estimated Total Water Use (ETWU) is calculated based on the plants used and irrigation method selected for the landscape design. ETWU must be below the MAWA. (2) In calculating the Maximum Applied Water Allowance and Estimated Total Water Use, a project applicant shall use the following ETo values: Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual ETo 2.3 | 2.4 | 4.1 | 4.9 | 6.4 | 7.0 | 7.8 | 7.4 | 5.7 | 4.1 | 2.6 | 2.2 | 56.7 (3) Water budget calculations shall adhere to the following requirements: (a) The plant factor used shall be from WUCOLS or from horticultural researchers with academic institutions or professional associations as approved by the California Department of Water Resources (DWR). The plant factor ranges from 0 to 0.1 for very low water using plants, 0.1 to 0.3 for low water use plants, from 0.4 to 0.6 for moderate water use plants, and from 0.7 to 1.0 for high water use plants. (b) All water features shall be included in the high water use hydrozone and temporarily irrigated areas shall be included in the low water use hydrozone. (c) All Special Landscape Areas shall be identified and their water use calculated as shown in Appendix A. (d) ETAF for new and existing (non-rehabilitated) Special Landscape Areas shall not exceed 1.0. H. Irrigation Design Plan requirements. This section applies to landscaped areas requiring permanent irrigation, not areas that require temporary irrigation solely for the plant establishment period. (1) Irrigation systems shall be designed, maintained, and managed to meet or exceed an average irrigation efficiency of 0.75 for overhead spray devices and 0.81 for drip system devices. (2) All irrigation systems shall be designed to prevent runoff, over-spray, lowhead drainage and other similar conditions where water flows off-site on to adjacent property, non-irrigated areas, walk, roadways, or structures. Irrigation systems shall be designed, constructed, managed, and maintained to achieve as high an overall efficiency as possible. The irrigation system shall be designed to ensure that the dynamic pressure at each emission device is within the manufacturer's recommended pressure range for optimal performance. (3) Landscaped areas shall be provided with a smart irrigation controller utilizing non-volatile memory which automatically adjusts the frequency and/or duration of irrigation events in response to changing weather conditions unless the use of the property would otherwise prohibit use of a timer. The planting areas shall be grouped in relation to moisture control zones based on similarity of water requirements (i.e., turf separate from shrub and groundcover, full sun exposure areas separate from shade areas, top of slope separate from toe of slope). Additional water conservation technology may be required, where necessary, at the discretion of the Community Development Director. (4) Water systems for common open space areas shall use non-potable water, if approved facilities are made available by the water purveyor. Provisions for the conversion to a non-potable water system shall be provided within the landscape plan. Water systems designed to utilize non-potable water shall be designed to meet all applicable standards of the California Regional Water Quality Control Board and the Riverside County Health Department. (5) Graywater systems promote the efficient use of water and are encouraged to assist in on-site landscape irrigation. All graywater systems shall conform to the California Plumbing Code (California Code of Regulations Title 24, Part 5, Chapter 16) and any applicable local ordinance standards. (6) Separate valves shall be provided for separate water use planting areas, so that plants with similar water needs are irrigated by the same irrigation valve. All installations shall rely on highly efficient state of the art irrigation systems to eliminate runoff and maximize irrigation efficiency as required by the Landscaping Guide. (7) If the water pressure is below or exceeds the recommended pressure of the specified irrigation devices, the installation of a pressure regulating device is required to ensure that the dynamic pressure at each emission device is within the manufacturer's recommended pressure range for optimal performance. (8) Static water pressure, dynamic or operating pressure and flow reading of the water supply shall be measured. These pressure and flow measurements shall be conducted at the design stage. If the measurements are not available at the design stage, the measurements shall be conducted at the installation. (9) The capacity of the irrigation system shall not exceed: (a) The capacity required for peak water demand based on water budget calculations; (b) Meter capacity; or (c) Backflow preventer type and device capacity. (10) Sprinkler heads and other emission devices shall have matched precipitation rates, unless otherwise directed by the manufacturer. (11) In mulched planting areas, the use of low volume irrigation is required to maximize water infiltration into the root zone. (12) Slopes greater than twenty-five (25) percent shall not be irrigated with an application system with a precipitation rate exceeding 0.75 inches per hour. This restriction may be modified if the landscape designer specifies an alternative design or technology, as part of the landscape documentation required to be submitted pursuant to this chapter, and if there is a clear demonstration that no runoff or erosion will occur. Prevention of runoff and erosion must be confirmed during the irrigation audit. (13) Areas less than ten (10) feet in width in any direction shall be irrigated with subsurface irrigation or other means that produce no runoff or overspray. (14) Overhead irrigation shall not be permitted within twenty-four (24) inches of any non-permeable surface. There are no restrictions on the irrigation system type if the landscape area is adjacent to permeable surfacing and no overspray and runoff occurs. (15) Overhead irrigation shall be limited to the hours of eight (8:00) p.m. to nine (9:00) a.m. (16) All irrigation systems shall be equipped with the following: (a) A smart irrigation controller as defined in Section 9.283.040(G)(3) of this chapter; (b) A rain sensing device to prevent irrigation during rainy weather; (c) Anti-drain check valves installed at strategic points to minimize or prevent low-head drainage; (d) A manual shut-off valve shall be required as close as possible to the point of connection of the water supply, to minimize water loss in case of an emergency or routine repair; (e) A pressure regulator when the static water pressure is above the recommended operating pressure of the irrigation system; (f) Backflow prevention devices; (g) Flow sensors that detect high flow conditions created by system damage or malfunction on all non-residential landscapes and residential landscapes of five thousand (5,000) square feet or larger; and (h) Riser protection components for all risers adjacent to hardscapes or in high traffic areas. (17) Master shut-off valves are required on all projects except landscapes that make use of technologies that allow for the individual control of sprinklers that are individually pressurized in a system equipped with low pressure shut down features. (18) Landscape water meters, defined as either a dedicated water service meter or private submeter, shall be required for all non-residential irrigated landscapes of one thousand (1,000) square feet but not more than five thousand (5,000) square feet and residential irrigated landscapes of five thousand (5,000) square feet or greater. (19) Irrigation design plans shall identity and site the following: (a) Hydrozones: (i) Each hydrozone shall be designated by number, letter or other designation; (ii) A hydrozone information table shall be prepared for each hydrozone; (b) The areas irrigated by each valve; (c) Irrigation point of connection (POC) to the water system; (d) Static water pressure at POC; (e) Location and size of water meter(s), service laterals, and backflow preventers; (f) Location, size, and type of all components of the irrigation system, including automatic controllers, main and lateral lines, valves, sprinkler heads and nozzles, pressure regulator, drip and low volume irrigation equipment; (g) Total flow rate (gallons per minute), and design operating pressure (psi) for each overhead spray and bubbler circuit, and total flow rate (gallons per hour) and psi for each drip and low volume irrigation circuit; (h) Precipitation rate (inches per hour) for each overhead spray circuit; Irrigation legend with the manufacturer name, model number, and general description for all specified equipment, separate symbols for all irrigation equipment with different spray patterns, spray radius, and precipitation rate; (i) Irrigation system details for assembly and installation; (j) Recommended irrigation schedule for each month, including number of irrigation days per week, number of start times (cycles) per day, minutes of run time per cycle, and estimated amount of applied irrigation water, expressed in gallons per month and gallons per year, for the established landscape; and (k) Irrigation design plans shall contain the following statement, "I agree to comply with the criteria of Chapter 9.283 of Title 9 of the Jurupa Valley Municipal Code and to apply the criteria for the efficient use of water in the irrigation design plan." (20) For each valve, two (2) irrigation schedules shall be prepared, one for the initial establishment period of six (6) months and one for the established landscape, which incorporate the specific water needs of the plants and turf throughout the calendar year. (21) Irrigation design plans and planting plans (Section 9.283.040(F)) shall be drawn at the same size and scale. I. Soil Management Plan requirements. (1) After mass grading, the project applicant shall: (a) Perform a preliminary site inspection; (b) Determine the appropriate level of soil sampling and sampling method needed to obtain representative soil sample(s); (c) Conduct a soil probe test to determine if the soil in the landscape area has sufficient depth to support the intended plants; and (d) Obtain appropriate soil sample(s). (2) The project applicant shall submit soil sample(s) to a laboratory for analysis and recommendation. The soil analysis shall include: (a) Soil texture; (b) Infiltration rate determined by laboratory test or soil texture infiltration rate tables; (c) pH; (d) Total soluble salts; (e) Sodium; and (f) Recommendations. (3) The project applicant shall prepare documentation describing the following: (a) Soil type; (b) Identification of limiting soil characteristics; (c) Identification of planned soil management actions to remediate limiting soil characteristics; and (4) The applicant shall submit the soil analysis report and documentation verifying implementation of soil analysis report recommendations to the city pursuant to the requirements of Section 9.283.060. J. Grading Design Plan requirements. The landscape documentation submitted shall also include rough/precise grade elevations prepared for the project by a licensed civil engineer or licensed landscape architect.

(Ord. No. 2015-17, § 2(9.50.040), 11-19-2015; Ord. No. 2021-09, § 4, 4-15-2021)

Ask a question about Jurupa Valley law

Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.