For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.283.060 — Compliance and plan submittal process

Municipal Code of the City of Jurupa Valley, California (Codified through Ordinance No. 2026-12, enacted October 1, 2026 (Supp. No. 28)) · Jurupa Valley Municipal Code § 9.283.060

Corpus is an independent public-information project, not the official City of Jurupa Valley website. Stable reference: corpuslaw.us/code/326314bb-f4fb-4f83-9614-81edc8e58bed

Sec. 9.283.060. - Compliance and plan submittal process.

Prior to issuance of a building permit for the project, the project applicant shall: (1) Submit all landscape documents required by Section 9.283.040 for review and approval by the Community Development Director. The planting plan, irrigation design plan, and soils management plan shall be reviewed by an independent licensed landscape architect to ensure that all components of the plans adhere to the requirements of this chapter. The licensed landscape architect shall sign all plans verifying that the plans comply with this chapter. Any plans submitted without the signature of a licensed landscape architect shall not be accepted for review. (2) Prior to issuance of a certificate of occupancy or final inspection for the project, a regular maintenance schedule and a Certificate of Completion shall be submitted to the Community Development Director certifying that the landscaping has been completed in accordance with the approved planting and irrigation design, soil management, and grading design plans for the project. The Certificate of Completion shall be signed by a licensed landscape architect and shall indicate: (a) Date; (b) Project information: (i) Project name; (ii) Project applicant name, telephone and mailing address; (iii) Project address and location; and (iv) Property owner name and mailing address; (c) Prior to backfilling, evidence that the party responsible for irrigation installation conducted a preliminary field inspection of the irrigation system (evidence of field inspection shall be attached); (d) The landscaping has been installed in conformance with the approved planting and irrigation design plans; (e) Irrigation audit report performed by a certified landscape irrigation auditor after project installation (audit report shall be attached); (f) The smart irrigation controller has been set according to the irrigation schedule; (g) The irrigation system has been adjusted to maximize irrigation efficiency and eliminate overspray and runoff; and a copy of the approved landscape documentation (Section 9.283.040), the irrigation schedule (Section 9.283.050(A)) and the maintenance schedule (Section 9.283.060(B)) has been given to the property owner and local water purveyor; (h) The Model Water Efficient Landscape Worksheet; and (i) Verification that the maintenance schedule has been provided to the Community Development Director. (3) At a minimum, all landscape irrigation audits shall comply with the "Irrigation Association Certified Landscape Irrigation Auditor Training Manual" (2004 or most current) and shall be conducted by a certified landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape. (4) In large projects or projects with multiple landscape installations (i.e. production home developments) an auditing rate of one (1) in seven (7) lots or approximately fifteen (15) percent will satisfy this requirement. (5) The Community Development Director, or his or her designee, may enter upon the project site at any time before, during and after installation of the landscaping, to conduct inspections for the purpose of enforcing this chapter.

(Ord. No. 2015-17, § 2(9.50.060), 11-19-2015; Ord. No. 2021-09, § 4, 4-15-2021)

Ask a question about Jurupa Valley law

Corpus searches the Jurupa Valley sections it holds and shows the ones that match, with their citations. Free, no sign-in.