§ 9.166.035: Permits required.
A. No power supply facility may be installed, constructed, relocated, or substantially modified without the approval of a site development permit reviewed by the Director or the Planning Commission as provided under Section 9.166.030. B. To the extent possible, the applicant shall request permits for all proposed site development permits at the same time in a coordinated application. Permits generally will not be granted for individual power supply facilities, and applications for a permit always require disclosure of information relevant to the coordinated design and location of all power supply facilities proposed in connection with the subject cable system. C. Every power supply facility shall be constructed, located, operated and maintained at all times in compliance with these regulations and all applicable laws and regulations of the City of Lake Forest, the State of California, and the United States of America. D. Applicants are required to apply for, obtain and comply with any and all applicable permits of the Building and Safety Division and/or Public Works Department of the City in conjunction with the installation and construction of the proposed facilities, including without limitation building permits and encroachment permits as applicable.
( Ord. 176 § 1, 2007 )
Ask a question about Lake Forest law
Corpus searches the Lake Forest sections it holds and shows the ones that match, with their citations. Free, no sign-in.