§ 15.04.1.145 — Signing and sealing of plans and other submittal documents
Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Municipal Code § 15.04.1.145
Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/599e498c-87e7-47b6-b1d0-65a794a79086
15.04.1.145 - Signing and sealing of plans and other submittal documents.
A. General. Plans and other submittal documents when submitted with a permit application shall be certified pursuant to this Section. If any requirement of this Section is contrary to State law, the State law shall govern. B. Nonprofessional. Plans or other submittal documents not required to be prepared by a registered design professional shall be electronically or digitally signed as required by current California Law by the preparer with the index sheet signed by the preparer. Name, address, telephone and email address of preparer shall be typed or printed on the index sheet. If there is no index sheet then all the copies submitted shall be signed with at least one (1) copy indicating preparer's name, etc. If a professional has prepared the calculations or a report that requires incorporation into the plans, the professional should appropriately sign the portion of the nonprofessionally prepared plans where the work for which he or she is responsible for has been shown and incorporated into the plans. C. Registered Design Professional. Plans and other submittal documents prepared by a registered design professional (architect, civil engineer, structural engineer, mechanical engineer, electrical engineer, landscape architect, etc.) shall be electronically or digitally signed, sealed and dated as required by current California law by the professional with the index sheet signed and sealed by the professional. Name, address, telephone and email address of the professional shall be typed or printed on the index sheet. If there is no index sheet then all the copies submitted shall be signed and sealed with at least one (1) copy indicating professional's name, etc. If the professional is responsible for only a portion of the plan sheet (such as only for certain structural items of a building), then appropriate notes on the sheet(s) shall indicate the extent of responsibility with signatures as above. Alternatively, the professional preparing the plans may note on the plans a reference to the calculations or reports prepared by other professionals that were used in preparing the plans. D. Reports Prepared by a Registered Design Professional. Reports should have an appropriate page where seals, signatures, and date of signage of persons responsible for the report are displayed. E. Calculations Prepared by a Registered Design Professional. Calculations should have an index sheet where the seal, signature, and date of signage of person responsible for the calculations are displayed. If there is no index sheet then all the calculation sheets require seal, signature, and date of signage. If the plans for which the calculations were prepared are appropriately signed, sealed, and dated by a different professional then the plan sheets do not require the additional signature of the professional preparing the calculations. If the plans were prepared by a nonprofessional, then the plan sheets where items for which calculations were prepared should be appropriately signed, sealed, and dated by the person preparing the calculations. The professional signing the plans may note on the plans that his or her responsibility is only for the items for which he or she prepared the calculations. F. Title 24 Energy Compliance Forms. Title 24 Energy Compliance Forms shall be shown on the plans and shall be "wet" or electronically signed as required by current California law by the appropriate parties. G. Signatures on Survey and Plot Plan. Surveys and plot plans shall be electronically or digitally signed, sealed and dated as required by current California law. When approved by the Building Official to receive physical plans, four (4) copies shall be submitted of required boundary and topographic surveys and plot plans. The copies shall be appropriately signed with at least two (2) copies having "wet" signatures and seals. Statements shall also be "wet" signed. The remaining copies shall be signed. H. Signatures and Seals on Revisions. Signatures and seals on revisions to drawings submitted after permit issuance for revision plan check shall be as required for new submittals. If a revised index sheet with seal and signature is not submitted then all of the revised plan sheets submitted shall be signed and, if appropriate, sealed as required. Revisions of documents prepared and signed by a registered design professional shall be accompanied by written permission of the registered design professional of record acknowledging such changes. Such revisions shall be prepared and signed by a registered design professional as required by current California law. I. Corrections During Plan Check. Signatures and seals on revisions or corrections submitted during the plan check shall be as required for new submittals.
(Ord. No. 13861, § 4, 9-15-2025)
Ask a question about Oakland law
Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.