For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.04.1.175 — Means of egress during construction

Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Municipal Code § 15.04.1.175

Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/3db55c64-8874-41ab-89ca-da150f69ac01

15.04.1.175 - Means of egress during construction.

Required means of egress shall be maintained at all times during construction, demolition, remodeling or alterations and additions to any building, as per the provisions of the California Building Code Sections 3302, 3310.1 and 3310.2 to residential uses applicable to HCD 1 (ref. CBC 1.8.2.1.1) and HCD 2 (ref. CBC 1.8.2.1.3). Stairways are required for buildings up to fifty (50) feet in height or up to four (4) stories, or buildings taller than fifty (50) feet in height that have been altered, shall be provided with no fewer than one (1) temporary lighted stairway unless one (1) or more of the permanent stairways are erected as the construction progresses.

(Ord. No. 13861, § 4, 9-15-2025)

Ask a question about Oakland law

Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.