§ 15.04.2.350 — Application for permit
Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Municipal Code § 15.04.2.350
Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/d2331b92-99ec-4440-b035-8cccfd4baa8f
15.04.2.350 - Application for permit.
A. Refer to Section 15.04.1.135 of this Chapter. B. Except as permitted in Subsection C of this Section, no electrical system or equipment regulated by this Code shall be installed, altered, repaired, replaced or remodeled unless a separate electrical permit or "combination permit" has been obtained from the Building Official for each separate building or structure. C. Refer to National Electrical Code (NEC) Article 90-2(a). D. Exemption from, the permit requirements of this Code shall not be deemed to grant authorization for work to be done in violation of the provisions of this Code or other laws or ordinances of this jurisdiction. E. A plant permit may be issued by the Building Official to a person not holding a California State Electrical Contractor License but who is regularly employed as an electrician in a plant or business. The permit shall be issued upon written application from the owner or manager of the plant or business in which the person is employed. The application shall certify that the proposed permittee is competent to perform the electrical work and shall certify that all work will be performed under the requirements of this Chapter. All electrical work shall be done under the direction and supervision of the permittee. All electrical work, excepting the maintenance and repair of existing electrical installation and repair, shall be done only under permits issued as otherwise required under this Article. The owner or manager of any plant or business employing the permittee shall immediately notify the Building Official in writing upon termination of the permittee and such notification shall cancel the plant permit. Evidence of any electrical work being done under the plant permit that is in violation of any provisions of this Chapter shall be grounds for immediate suspension or cancellation of the permit by the Building Official. The plant permit is renewable on an annual basis from the date of issuance for a fee established by the Master Fee Schedule. F. A meter reset permit shall be issued by the Building Official to any person for the purpose of reconnecting a supply of service or reinstalling a meter whenever the serving utility shall disconnect electrical service supply or remove any electrical meter to a structure or building for a period of ninety (90) days or more in a residential occupancy or thirty (30) days or more in a commercial or industrial occupancy. An inspection of the occupancy and other pertinent facilities is required. The serving utility will be authorized by the Building Official to reconnect the supply of service or reinstall any meter upon the condition that the occupancy is found to be void of hazardous or unsafe conditions. Any hazardous or unsafe conditions found will require that an electrical permit (or combination permit) be obtained, as elsewhere contained in this Chapter, to correct those same conditions. The meter reset permit does not cover electrical work as elsewhere contained in this Chapter. Meter reset permit fee is established by the Master Fee Schedule.
(Ord. No. 13861, § 4, 9-15-2025)
Ask a question about Oakland law
Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.