§ 15.04.2.375 — Connection approval
Oakland Municipal Code (Supp. No. 103: codified through Ordinance No. 13873, adopted February 17, 2026) · Oakland Municipal Code § 15.04.2.375
Corpus is an independent public-information project, not the official City of Oakland website. Stable reference: corpuslaw.us/code/54ba16c0-bea2-4a5a-aa8d-02510ca390ef
15.04.2.375 - Connection approval.
A. No person shall make connections from a source of energy to any electrical system or equipment regulated by this Code and for which a permit is required until approved by the Building Official. B. Whenever any person engaged in the distribution or sale of electrical energy shall set or install, or reset or reinstall, in, or about any building any meter for the measurement of electrical energy; or shall connect or reconnect supply or service to any installation of electrical equipment in, on, or about any building; or shall change the nominal voltage of supply for service to any installation of electrical equipment, in, on, or about any building; or shall change any such supply for service from two-wire to three-wire or vice versa, or from single phase to polyphase or vice versa, or from direct current to alternating current or vice versa, said person shall receive written authorization from the Building Official or the Building Official's designated representative, which authorization shall specify the location and address of the installation affected, provided, however, that said authorization need not be received with respect to any such meter installation or reinstallation or any such supply or service connection or reconnection, authorized by the Building Official or the Building Official's designated representative within thirty (30) days or more in residential occupancies or ninety (90) days or more in other occupancies of previous authorization; provided further that the Building Official may, at his or her discretion, waive temporarily or permanently any or all requirements of this Section by giving written notice of such waiver to all persons engaged in the distribution or sale of electrical energy; and said Building Official may likewise at any time revoke such waiver by written notice to all such persons. C. The Building Official may authorize temporary connection of the electrical equipment to the source of energy for the purpose of testing the equipment, or for use under a temporary certificate of occupancy. D. Provisions shall not be made for installing more than a single utility meter in the service equipment for a single-family dwelling, including other structures on the same property, without written authorization by the Building Official prior to their installation.
(Ord. No. 13861, § 4, 9-15-2025)
Ask a question about Oakland law
Corpus searches the Oakland sections it holds and shows the ones that match, with their citations. Free, no sign-in.