§ 6-7.403 — Monitoring facilities
City of Ontario, California, Municipal Code (2026 S-32: Current through Ordinance 3338, passed 7-21-2026) · Ontario Municipal Code § 6-7.403
Corpus is an independent public-information project, not the official City of Ontario website. Stable reference: corpuslaw.us/code/eeb09869-50a1-45db-b486-f365b9d68876
Sec. 6-7.403. Monitoring facilities.
(a) Each industrial user shall install and maintain a monitoring facility for each point-source to the sewerage system. The monitoring facility and its location are subject to approval by the Administrator. (b) All proposed construction of commercial and/or industrial buildings shall include plans to install a surveillance/monitoring facility for each point-source to the sewerage system. The surveillance/monitoring facility and its location are subject to approval by the Administrator or in accordance with the City Standard Drawings. (c) When more than one user can discharge into a common private sewer, the Administrator may require installation of a separate monitoring facility for each user. Also, when in the judgement of the Administrator, there is a significant difference in wastewater constituents and characteristics produced by different operations of a single user, the Administrator may require that a separate monitoring facility be installed for each segregated wastestream. This may include, but may not be limited to, segregation of Categorical process wastestreams from additional wastestreams not subject to categorical standards. (d) City standard drawings establish design requirements, applicable construction standards, safety devices and specifications for surveillance/monitoring facilities. The design plans for any required or surveillance/monitoring facility shall be prepared and signed by an engineer registered in the State of California. Such plans shall be reviewed and must be approved by the Administrator prior to any construction of said facility. The approval of the design of any facility meeting the requirements set forth in this section or any recommendation or requirements made by the Administrator, shall not relieve the user from the responsibility of meeting the requirements of this chapter, and shall not impute any liability to the City for the adequacy of such facility under the actual conditions of use. (e) If explosive or flammable substances are stored or used on-site, and such substances have the potential of entering the sewerage system, the user may be required to install, operate and maintain a combustible gas monitoring system and facilities to divert the entire wastewater flow to a holding tank when the combustible gas level is greater than twenty percent (20%) of the lower explosive limit. These facilities will be provided and maintained at the user's own cost and expense. A user so notified shall provide detailed gas monitoring and wastewater diversion plans, including facilities and operating procedures, to the Administrator for review. (f) If required by the City in writing, the user shall submit construction plans and/or instrumentation for approval by the City of the following: (1) A pH-recording instrument with a strip chart to record all flows on a twenty-four (24) hour continuous basis; (2) A conductivity meter with a strip chart to record all flows on a twenty-four (24) hour continuous basis; (3) A flume, weir, flow meter or similar device approved by the City and suitable to measure the non-domestic flow rate and total volume on a continuous basis. The monitoring equipment shall be maintained at all times in a safe and proper operating condition by the user. All devices used to measure wastewater flow and quality shall be calibrated at a frequency determined by the Administrator to ensure their accuracy. The costs of installing and maintaining such device(s) shall be at the sole expense of the user. (g) Construction of any monitoring facility or device shall be completed within a time period established by the Administrator. (h) Unrestricted access to the monitoring facility shall be available to authorized personnel of the City and IEUA at all times. Unreasonable delays in allowing City or IEUA personnel access to the user's premises shall be a violation of this chapter. (i) Any temporary or permanent obstruction to safe and easy access to the monitoring facility or surveillance/monitoring facility shall be promptly removed by the user at the written or verbal request of the Administrator and shall not be replaced. The costs of clearing such access shall be borne by the user. (j) A monitoring facility or surveillance/ monitoring facility may be required to include a security closure that can be locked by the City during sampling or upon termination of service. (k) A monitoring facility or surveillance/ monitoring facility shall be located so that samples can be taken immediately downstream from the pretreatment facilities, if any exist, or where no treatment is employed, immediately downstream from the user's wastestream. (l) Any sample taken from the monitoring facility shall be considered representative of the user's discharge. (m) Users are responsible for cleaning and maintaining the monitoring facility and equipment. Oils, solids, and other debris removed from the monitoring facility shall not be discharged to the sewer. (§ 3, Ord. 2755, eff. April 4, 2002, as amended by § 16, Ord. 2816, eff. December 1, 2005)
Ask a question about Ontario law
Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.