§ 8-18.070 — Time period for compliance/priority designation
City of Ontario, California, Municipal Code (2026 S-32: Current through Ordinance 3338, passed 7-21-2026) · Ontario Municipal Code § 8-18.070
Corpus is an independent public-information project, not the official City of Ontario website. Stable reference: corpuslaw.us/code/c10d4549-7183-48ea-953f-1b6111a34ff7
Sec. 8-18.070. Time period for compliance/priority designation.
(a) Plan, permits and construction. Each building within the scope of this chapter shall be structurally altered to comply with the minimum standards in this chapter within the time periods shown in Table A. Minimum plan requirements shall be as specified by the Building Official. Failure to comply with the program within the specified time frame shall be a violation of this chapter and subject the owner to the penalties and remedies described in Sec. 8-18.120. (b) Screening form (optional). Within the time limits allowed in Table A, if the owner of any building believes he/she is not subject to the provisions of this chapter, owner shall submit a screening form to the Building Department. The screening form shall be completed by a licensed civil or structural engineer and shall state whether the structure conforms to the earthquake design provisions contained in this chapter. Retrofit of said building shall not be required if screening form determines that the structure conforms with the earthquake design provisions of this chapter, as determined by the Building Official. Retrofit of said building shall be required if owner fails to submit the screening form within the time limit specified in Table A or if the screening form determines that the structure does not conform with the design requirements of this chapter. The requirement for said retrofit is not appealable if the screening form states that the structure does not conform to the earthquake design provisions contained in this chapter. TABLE ATIME PERIOD FOR COMPLIANCE | Required | Action | By Owner Risk Level | Submit Structural Assessment | Plan and Obtain Permit | Complete Construction High Risk | 9 months from notice to owner | 9 months from structural assessment submittal | 18 months from plan/permit approval Medium Risk | 12 months from notice to owner | 12 months from structural assessment submittal | 24 months from plan/permit approval Low Risk | 18 months from notice to owner | 18 months from structural assessment submittal | 24 months from plan/permit approval (c) Risk designations. The Building Official shall prioritize enforcement of this chapter as defined in Table B. TABLE BRISK DESIGNATION Risk Level | Description High Risk | Structures containing multi-family residential structures or public facilities Medium Risk | Structures containing commercial, office or retail uses Low Risk | Structures containing manufacturing or industrial uses (§ 2, Ord. 3324, eff. February 19, 2026)
Ask a question about Ontario law
Corpus searches the Ontario sections it holds and shows the ones that match, with their citations. Free, no sign-in.