§ 15.19.030 — Expedited Permitting Process
Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 15.19.030
Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/2db2cfe8-6c4d-4408-93c1-3b9b698effa4
§ 15.19.030: Expedited Permitting Process.
A. Streamlined Process. Consistent with Government Code Section 65850.7, the Building Official shall implement an expedited, streamlined permitting process for electric vehicle charging stations, and adopt a checklist of all requirements with which electric vehicle charging stations shall comply in order to be eligible for expedited review. B. Checklist Effective with Commission Approval. The Building Official's checklist and procedures shall become effective upon approval by the director of public works or designee. Such procedures may be amended by the director of public works or designee from time to time. The city's adopted checklist and procedures shall be published on the city's website and shall be binding upon all applicants. C. Checklist Contents. The checklist and procedures may refer to the recommendations contained in the most current version of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist" of the "Zero-Emission Vehicles in California: Community Readiness Guidebook" as published by the Governor's Office of Planning and Research. Such checklist must ensure that all requirements of this chapter are met, including the following: 1. Standards for EV Station. Electric vehicle charging station equipment shall meet the requirements of the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories such as Underwriters Laboratories, and rules of the Public Utilities Commission or a Municipal Electric Utility Company regarding safety and reliability. 2. Electrical Code Requirements. Installation of electric vehicle charging stations and associated wiring, bonding, disconnecting means and overcurrent protective devices shall meet the requirements of Article 625 and all applicable provisions of the California Electrical Code. 3. Load Calculations. Installation of electric vehicle charging stations shall be incorporated into the load calculations of all new or existing electrical services and shall meet the requirements of the California Electrical Code. Electric vehicle charging equipment shall be considered a continuous load. 4. Anchorage. Anchorage of either floor-mounted or wall-mounted electric vehicle charging stations shall meet the requirements of the California Building or Residential Code as applicable per occupancy, and the provisions of the manufacturer's installation instructions. Mounting of charging stations shall not adversely affect building elements. 5. Property Owner Associations. In the technical review of a charging station, consistent with Government Code Section 65850.7, the Building Official shall not condition the approval for any electric vehicle charging station permit on the approval of such a system by an association, as that term is defined by Civil Code Section 4080.
( Ord. 06-22 , 2022 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.