§ 15.19.040 — Permit Application Processing
Municipal Code, City of Orange, California (through Ord. No. 01-26 adopted January 27, 2026) · Orange Municipal Code § 15.19.040
Corpus is an independent public-information project, not the official City of Orange website. Stable reference: corpuslaw.us/code/155558e8-f2f5-4205-b53a-ead9484c576d
§ 15.19.040: Permit Application Processing.
A. Adverse Impact Prohibited. Prior to submitting an application for processing, the applicant shall verify that the installation of an electric vehicle charging station will not have specific, adverse impact to public health and safety and building occupants. "Specific, adverse impact" means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. Verification by the applicant includes but is not limited to: electrical system capacity and loads; electrical system wiring, bonding and overcurrent protection; building infrastructure affected by charging station equipment and associated conduits; areas of charging station equipment and vehicle parking. B. Permit Applications. A permit application that satisfies the information requirements in the City's adopted checklist shall be deemed complete and be promptly processed. If the Building Official determines that the permit application is incomplete, the Building Official shall issue a written correction notice to the applicant, detailing all deficiencies in the application and any additional information required to be eligible for expedited permit issuance. Upon confirmation by the Building Official that the permit application and supporting documents meet the City's checklist requirements and are consistent with all applicable laws and health and safety standards, the Building Official shall, consistent with Government Code Section 65850.7, issue a permit for the electric vehicle charging station. C. Electronic Submission Permitted. Permit applications covered by this chapter and associated supporting documentation may be submitted via email to the Building Official, but such documentation shall only be considered received on the date the Building Official personally responds via email that the documents were received. In accepting such permit applications, the Building Official shall also accept electronic signatures on all forms, applications, and other documentation in lieu of a wet signature by any applicant. D. Appeal. The Building Official's determination may be appealed to the Planning Commission. 1. The cost to file the appeal shall be the same cost as for appeals filed under Section 17.08.070. 2. After conducting the public hearing, the Planning Commission shall issue its determination in writing based upon substantial evidence in the record. 3. The Planning Commission decision shall be final and cannot be appealed to the City Council.
( Ord. 06-22 , 2022 )
Ask a question about Orange law
Corpus searches the Orange sections it holds and shows the ones that match, with their citations. Free, no sign-in.