For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.05.086 — Grading activity during rainy season

Pasadena Municipal Code, California (Supp. No. 79: codified through Ordinance No. 7469, enacted May 18, 2026) · Pasadena Municipal Code § 14.05.086

Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/a087a1e7-2021-4d73-a852-2467b13ec833

14.05.086 - Grading activity during rainy season.

Activities such as clearing of brush and vegetation shall not be initiated during the rainy season on any site which is not adequately protected with desilting basins or other temporary drainage or control measures. A. Temporary Erosion Control. Temporary erosion control plans shall be provided for the following: 1. Temporary soil stabilization measures shall be installed on graded slopes exceeding a 3 to 1 ratio or 10 feet in height as required by Section 14.05.484(B). 2. Desilting facilities shall be provided at all drainage outlets from the graded site, designed for a 25-year, 6-hour storm intensity. They must be detailed on the plans. Design and specific recommendations shall be submitted for the following: a. Desilting basin volume based on gradient and nature of soils; b. The area of the graded site and identification of any temporary soil stabilization measures; c. Size of desilting basin outlet pipe and overflow; d. Dike requirements: minimum wall width, slope of walls, percent compaction, and other material features. 3. A standby crew for emergency work shall be available at all times during the rainy season. Necessary materials shall be available on site and stockpiled at convenient locations to facilitate rapid construction of temporary devices or to repair any damaged erosion-control measures when rain is imminent. 4. Devices shall not be moved or modified without the approval of the building official. 5. All removable protective devices shown shall be in place at the end of each working day when the 5-day rain probability forecast by the National Weather Service of the Department of Commerce exceeds 40 percent. 6. After a rainstorm, all silt and debris shall be expeditiously removed from check berms and desilting basins and the basins pumped dry. Any graded slope surface protection measures damaged during a rainstorm shall also be repaired immediately. 7. Fill slopes at the site perimeter must drain away from the top of the slope at the conclusion of each working day. 8. A guard shall be posted on the site whenever the depth of water in any device exceeds 18 inches. B. The plans required by this section shall indicate which streets will be paved and which drainage devices will be completed by October 15th. C. Placement of devices to reduce erosion damage within the site is left to the discretion of the civil engineer. These devices, if any, must be shown on the plan if their presence will affect the required capacity of the desilting basin. D. Outlet conditions from the desilting basin shall not exceed downstream limitations, with the exception of overflow which is to be designed to provided capacity of 1.5 times the maximum design flow.

(Ord. 7127 § 5 (part), 2007: Ord. 6483 § 2 (part), 1992)

Ask a question about Pasadena law

Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.