14.05.180 - Fills.
A. Location. Fill slopes shall not be constructed on existing slopes steeper than 2 to 1 nor where the fill slope toes out within 12 feet horizontally of the top of a lower existing or planned cut slope, except in the case of slopes of minor height when approved by the building official. B. Preparation of Ground. 1. The ground surface shall be prepared to receive fill by removing vegetation, non-complying fill, topsoil, and other unsuitable materials and scarifying to at least a depth of 5 inches to provide a bond with the new fill. Where fills are constructed on terraced lots, hillsides or slopes steeper than 5 to 1, and the height of the fill is greater than 5 feet, benches shall be cut into sound bedrock or other competent material as determined by the soils engineer. The bench under the toe of a fill on a slope steeper than 5 to 1 shall be at least 10 feet wide. The area beyond the toe of fill shall be sloped to maintain sheet overflow or a paved drain shall be provided, to allow for adequate drainage away from the fill. 2. After the foundation for the fill has been cleared, plowed or scarified, it shall be disked or bladed until it is uniform and free from large clods, brought to the proper moisture content and compacted in the same manner and to the same degree as required for the fill material. The foundation shall be compacted to the full depth of disturbance and in no case shall the depth be less than 4 inches. 3. Where fill is to be placed over a cut, the bench under the toe of the fill shall be at least 10-feet wide, but the cut must be made before placing fill and approved by the soils engineer and engineering geologist as a suitable foundation for fill. Unsuitable soil is soil which, in the opinion of the building official, the civil engineer, the soils engineer or the geologist, is not competent to support other soil or fill to support structures, or to perform satisfactorily the other functions for which the soils is intended. C. Fill Material. 1. Detrimental amounts of organic material shall not be permitted in fills. Except as permitted by the building official, no rock or similar irreducible material with a maximum dimension greater than 8 inches shall be buried or placed in fills. The building official may permit placement of large rock when the soils engineer properly devises a method of placement, continuously inspects its placement, and approves the fill stability. The following conditions shall also apply: a. Prior to issuance of the grading permit, potential rock disposal areas shall be delineated on the grading plan. b. Rock sizes greater than 8 inches in maximum dimension shall be 10 feet or more below grade, measured vertically. c. Rocks greater than 8 inches shall be placed so as to be completely surrounded by soils. No nesting of rocks is permitted. D. Compaction. 1. All fills shall be compacted to a minimum of 90 percent maximum density as required by the California Building Code. 2. Where lower density and expansive types of soil exist, then permission for lesser compaction may be granted by the building official upon showing of good cause. E. Slope Gradient. Fill slopes shall be no steeper than 2 horizontal to 1 vertical (2:1). F. Drainage and Terracing. Drainage and terracing shall be provided and the area above fill slopes and the surfaces of terraces shall be graded and paved as required by Section 14.05.200. G. Height of Slopes. No fill slopes shall be constructed over 30 feet in height. The height of retaining walls shall be included in measuring the height of slopes. H. Utility Line Backfill. All backfill in utility line trenches, both inside and outside of the residential dwelling, shall be compacted and tested in compliance with subsection D of this section and the soils engineer shall verify to the building official that this backfilling has been satisfactorily accomplished. Alternate methods of filling and reduced compaction requirements may be applied on certain projects when specified by the soils engineer and approved by the building official. Exception: on single utility line lot projects where no soils engineer was present during grading of the site, the building official may waive tested compaction for utility lines serving 1 lot and allow the use of approved material which is relatively self-compacting. This material and the method of placement must be approved by the building official prior to backfilling. I. Maintenance of Roadway Grading. Any portion of a roadway fill slope not located entirely within the dedicated public roadway easement shall be maintained by the abutting landowner according to standards established by the building official. J. Road, Walk and Driveway Site. The maximum height of finished fill slopes developed for roads, walks and driveways shall not exceed 8 feet. Driveways and parking pads shall be graded in conformance with requirements specified for driveways in Title 17 of this code. K. Finished Slopes. All fill slopes shall be contoured to meet upper, lower and side slopes. The finished horizontal slope plane shall not exceed 50 feet in width and shall undulate in a manner which is similar to the natural topography in the vicinity of the site. L. Exceptions. The building official may waive the requirements of this section for minor fills for which a soils engineering report is not required, provided the fill is not intended to support any structure.
(Ord. 7127 § 5 (part), 2007: Ord. 6483 § 2 (part), 1992)
Ask a question about Pasadena law
Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.