11.04.210 - Excavation—Construction, reconstruction requirements.
The applicant shall backfill and pave or resurface trenches cut in the street under the immediate direction and control of the city engineer. The backfill, compaction, and resurfacing shall be performed in accordance with the Standard Drawings and Specifications and the following requirements: A. All longitudinal trenches greater than twenty feet in length cut in streets within five years of the date of construction or more recent resurfacing shall have an eight-foot wide asphalt concrete resurfacing. The asphalt concrete shall be laid with a self-propelled mechanical spreading and finishing machine and be approximately centered along the trench centerline. B. All excavations in streets having been constructed or resurfaced more than five years prior to the excavation need only be backfilled and resurfaced in accordance with the Standard Drawings and Specifications.
(Ord. 604 § 1 (part), 1971: 1965 code Title XIII, Ch. 3, § 4(E))