11.12.100 - Construction of controlled fills.

As supervised by the soils engineer, the following shall be used as a guide for filled areas. For specific projects, it may be necessary to make adjustment predicated upon the analysis of the material proposed to be used for the fill and other conditions pertaining to the project, and such adjustments may be made upon written recommendation of the soils engineer. A. General Description. The work shall consist of clearing and grubbing, removal of existing structures, preparation of land to be filled, filling of the land, spreading, compaction and control of the fill, structures and all subsidiary work necessary to complete the grading of the filled areas to conform with the lines, grades and slopes as shown on the accepted plans. B. Clearing, Grubbing and Preparing Areas to be Filled. 1. All timber, logs, trees, brush, objectionable amounts of vegetable matter, and other rubbish shall be removed from the site so as to leave the areas free from all debris. 2. The surface shall then be plowed or scarified to a depth of at least six inches, and until the surface is free from ruts, hummocks or other uneven features which would tend to prevent uniform compaction by the equipment to be used. 3. Where fills are made on hillsides or adjacent to slopes greater than one vertical to four horizontal, continuous steps or benches shall be cut into firm and/or fully compacted material before filling is begun. 4. After the foundation for the fill has been cleared, plowed or scarified, it shall be disced or bladed until it is uniform and free from large clods, brought to the proper moisture content, and compacted in the same manner and to the same degree as required for the fill material. Said foundation shall be compacted to the full depth of disturbance, and in no case shall said depth be less than six inches. C. Materials. Materials for the fill shall consist of material approved by the soils engineer and may be obtained from the excavation of lands, borrow pits, or any other approved sources. The material used shall be soil free of rocks or lumps of greater dimension that six inches in the top eighteen inches and shall not contain paper, wood, glass, tin, metal, cardboard or any other deleterious substances. D. Placing, Spreading and Compacting Fill Material. 1. All fills more than one foot in depth shall be compacted to not less than ninety percent of the maximum density as determined by the test method ASTM D-1557 and ASTM D-1556 and latest revisions after first clearing, grubbing, and preparing the natural ground surface as described in subsection B of Section 11.12.090. 2. Field density tests shall be made at a frequency determined by the soils engineer, but in no case shall tests be made at a greater interval than two feet of vertical fill. Except for finished grades, which shall be tested to the surface, the test may be taken in the compacted material several inches below the disturbed surface. No additional layers of fill shall be spread until the field density tests indicate that the specified density has been obtained. 3. Where loose materials remain on the slope after the final elevation of the slope has been attained, these loose materials shall either be removed or be compacted to eighty-five percent, as determined by the test method listed in paragraph 1 of this subsection D, to a depth nine inches below the surface of the slope. E. Supervision. Sufficient time shall be spent by the soils engineer on the site each day that fills are placed or other pertinent work is accomplished to permit the soils engineer to certify to the proper compaction of all fills and to the adherence with all other requirements of this chapter for which he/she certifies. F. Seasonal Limits. No fill material shall be placed, spread or rolled during unfavorable weather conditions. When the work is interrupted by heavy rain, fill operations shall not be resumed until field tests by the soils engineer indicate that the moisture content and density of the fill are satisfactory for resumption of the filling operation.

(Ord. 649 § 1 (part), 1973: 1965 code Title XIII, Ch. 11, § 10)