§ 11.12.190 — Approval of work by city

Municipal Code of the City of Rialto, California (Codified through Ordinance No. 1713, passed April 28, 2026. (Supp. No. 39)) · Rialto Municipal Code § 11.12.190

Corpus is an independent public-information project, not the official City of Rialto website. Stable reference: corpuslaw.us/code/62752777-bd9a-43a0-84c3-3d7f3577eb29

11.12.190 - Approval of work by city.

A. Final Reports. Upon completion of the rough grading work and at the final completion of the work the following reports and drawings and supplements thereto will be submitted: 1. An as-graded grading plan prepared by the civil engineer including original ground surface elevations, as graded ground surface elevations, lot drainage patterns and locations, and elevations of all surface and subsurface drainage facilities. He/she shall provide certification that the work was done in accordance with the final approved grading plan; 2. A soil grading report prepared by the soil engineer including locations and elevations of field density tests, summaries of field and laboratory tests and other substantiating data and comments on any changes made during grading and their effect on the recommendations made in the soil engineering investigation report. He/she shall provide certification as to the adequacy of the site for the intended use; 3. A geological grading report prepared by the engineering geologist including description of the geology of the site including any new information disclosed during the grading and the effect of same on recommendations incorporated in the approved grading plan. He/she shall provide certification as to the adequacy of the site for the intended use as affected by geologic factors. B. Notification of Completion. The permittee or his/her agent shall notify the development services department when the grading operation is ready for final inspection. Final approval shall not be given until all work including installation of all drainage facilities and their protective devices and all erosion control measures have been completed in accordance with the final approved grading plan and the required reports have been submitted.

(Ord. 1234 (part), 1995: Ord. 649 § 1 (part), 1973: 1965 code Title XIII, Ch. 11, § 19)