For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12.27.013 — Wastewater discharge permits

Municipal Code of the City of Rialto, California (Codified through Ordinance No. 1713, passed April 28, 2026. (Supp. No. 39)) · Rialto Municipal Code § 12.27.013

Corpus is an independent public-information project, not the official City of Rialto website. Stable reference: corpuslaw.us/code/23095a85-6264-48f8-8b22-2050a272de2f

12.27.013 - Wastewater discharge permits.

A. Wastewater Analysis. When requested by the city, a user must submit information on the nature and characteristics of its wastewater within thirty days of the request. The city is authorized to prepare a form for this purpose and may periodically require users to update this information. B. Wastewater Discharge Permit Requirement. 1. No significant industrial user shall discharge wastewater into the POTW without first obtaining a wastewater discharge permit from the city, except that a significant industrial user that has filed a timely application pursuant to Section 12.27.013(E) of this chapter may continue to discharge for the time period specified therein. 2. The city may require other users to obtain wastewater discharge permits as necessary to carry out the purposes of this chapter. 3. Any violation of the terms and conditions of a wastewater discharge permit shall be deemed a violation of this chapter and subjects the wastewater discharge permittee to the sanctions set out in Sections 12.27.019 through 12.27.022 of this chapter. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. C. Wastewater Discharge Permitting (Existing Connections). Any user required to obtain a wastewater discharge permit who was discharging wastewater into the POTW prior to the effective date of this chapter and who wishes to continue such discharges in the future, shall, within ninety days after said date, apply to the city for a wastewater discharge permit in accordance with Section 12.27.013(E) of this chapter, and shall not cause or allow discharges to the POTW to continue after one hundred twenty days of the effective date of this chapter except in accordance with a wastewater discharge permit issued by the city. D. Wastewater Discharge Permitting (New Connections). Any user required to obtain a wastewater discharge permit who proposes to begin or recommence discharging into the POTW must obtain such permit prior to the beginning or recommencing of such discharge. An application for this wastewater discharge permit, in accordance with Section 12.27.013(E) of this chapter, must be filed at least ninety days prior to the date upon which any discharge will begin or recommence. E. Wastewater Discharge Permit Application Contents. 1. All users required to obtain a wastewater discharge permit must submit a permit application. The city may require users to submit all or some of the following information as part of a permit application: a. Identifying Information: i. The name and address of the facility, including the name of the operator and owner. ii. Contact information, description of activities, facilities, and plant production processes on the premises; b. Environmental Permits. A list of any environmental control permits held by or for the facility. c. Description of Operations: i. A brief description of the nature, average rate of production (including each product produced by type, amount, processes, and rate of production), and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram, which indicates points of discharge to the POTW from the regulated processes; ii. Types of wastes generated, and a list of all raw materials and chemicals used or stored at the facility which are, or could accidentally or intentionally be, discharged to the POTW; iii. Number and type of employees, hours of operation, and proposed or actual hours of operation; iv. Type and amount of raw materials processed (average and maximum per day); v. Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge; d. Time and duration of discharges. e. The location for monitoring all wastes covered by the permit. f. Flow Measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in Section 12.27.011(B)(3) of this chapter. (40 CFR 403.6(e)). g. Measurement of Pollutants: i. The categorical pretreatment standards applicable to each regulated process and any new categorically regulated processes for existing sources. ii. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the city, of regulated pollutants in the discharge from each regulated process. iii. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. iv. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in Section 12.27.016(C) of this chapter. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the city or the applicable standards to determine compliance with the standard. v. Sampling must be performed in accordance with procedures set out in Section 12.27.016(D) of this chapter. h. Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge based on the analytical monitoring for that pollutant over a twelve consecutive months without detecting the pollutant at the minimum detection level established by the state in the city's WDR [40 CFR 403.12(e)(2)]. i. Any other information as may be deemed necessary by the city to evaluate the permit application. 2. Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. F. Reserved. G. Application Signatories and Certifications. 1. All wastewater discharge permit applications, user reports and certification statements must be signed by an authorized representative of the user and contain the certification statement in Section 12.27.015(M) of this chapter. 2. If the designation of an authorized representative is no longer accurate because a different individual or position has responsibility for the overall operation of the facility or overall responsibility for environmental matters for the company, a new written authorization satisfying the requirements of this section must be submitted to the city prior to or together with any reports to be signed by an authorized representative. 3. A facility determined to be a non-significant categorical industrial user by the city must annually submit the signed certification statement in Section 12.27.015(M) of this chapter. H. Wastewater Permit Decisions. The city will evaluate the data furnished by the user and may require additional information. Within thirty days of receipt of a complete permit application, the city will determine whether to issue a wastewater discharge permit. The city may deny any application for a wastewater discharge permit.

(Ord. No. 1523, § 1, 1-22-13)

Ask a question about Rialto law

Corpus searches the Rialto sections it holds and shows the ones that match, with their citations. Free, no sign-in.