For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.75.150 — Duties and responsibilities of the floodplain administrator

Municipal Code of the City of Rialto, California (Codified through Ordinance No. 1713, passed April 28, 2026. (Supp. No. 39)) · Rialto Municipal Code § 18.75.150

Corpus is an independent public-information project, not the official City of Rialto website. Stable reference: corpuslaw.us/code/aa46149c-4a7a-45b4-8af5-1c514dfbc006

18.75.150 - Duties and responsibilities of the floodplain administrator.

The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to the following. A. Permit Review. Review all development permits to determine that 1. Permit requirements of this chapter have been satisfied, 2. All other required state and federal permits have been obtained, 3. The site is reasonably safe from flooding, and 4. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. For purposes of this chapter, "adversely affects" means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will increase the water surface elevation of the base flood more than one foot at any point. B. Review, Use and Development of Other Base Flood Data. 1. When base flood elevation data has not been provided in accordance with Section 18.75.070, the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal or state agency, or other source, in order to administer Sections 18.75.170 through 18.75.240 of this chapter. Any such information shall be submitted to the City Council for adoption; or 2. If no base flood elevation data is available from a federal or state agency or other source, then a base flood elevation shall be obtained using one of two methods from the FEMA publication "Managing Floodplain Development in Approximate Zone A Areas—A Guide for Obtaining and Developing Base (100-year) Flood Elevations" dated July 1995 in order to administer Sections 18.75.170 through 18.75.240 of this chapter: a. Simplified method i. 100 year or base flood discharge shall be obtained using the appropriate regression equation found in a U.S. Geological Survey publication, or the discharge-drainage area method; and ii. Base flood elevation shall be obtained using the Quick-2 computer program developed by FEMA; or b. Detailed method i. 100 year or base flood discharge shall be obtained using the U.S. Army Corps of Engineers' HEC-HMS computer program; and ii. Base flood elevation shall be obtained using the U.S. Army Corps of Engineers' HEC-RAS computer program. C. Notification of Other Agencies. In alteration or relocation of a watercourse: 1. Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation; 2. Submit evidence of such notification to the Federal Insurance Administration, Federal Emergency Management Agency; and 3. Assure that the flood carrying capacity within the altered or relocated portion of said watercourse is maintained. D. Documentation of Floodplain Development. Obtain and maintain for public inspection and make available, as needed, the following: 1. Certification required by Section 18.75.170 C.1. (lowest floor elevations), 2. Certification required by Section 18.75.170 C.2 (elevation or flood proofing of nonresidential structures), 3. Certification required by Section 18.75.190 C.3 (wet floodproofing standard), 4. Certification of elevation required by Section 18.75.190 B (subdivision standards), 5. Certification required by Section 18.75.220 A (floodway encroachments), 6. Reports required by Section 18.75.240 C (mudflow standards). E. Map Determinations. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazard. Where there appears to be a conflict between a mapped boundary and actual field conditions, grade and base flood elevations shall be used to determine the boundaries of the special flood hazard area. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Sections 18.75.250 through 18.75.270 of this chapter. F. Remedial Action. Take action to remedy violations of this chapter as specified in Section 18.75.080. G. Within six months of information becoming available or project completion, whichever comes first, the floodplain administrator shall submit or assure that permit applicants submit technical or scientific data to FEMA for a letter of map revision (LOMR). Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data. H. For applications for building permits to improve buildings and structures, including alterations, movement, enlargement, replacement, repair, additions, rehabilitations, renovations, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the floodplain administrator, in coordination with the building official, shall: 1. Estimate the market value, or require the applicant to obtain an appraisal of the market value prepared by a qualified independent appraiser, of the building or structure before the start of construction of the proposed work; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made. 2. Compare the cost to perform the improvement, the cost to repair the damaged building to its pre-damaged condition, or the combined costs of improvements and repairs, when applicable, to the market value of the building or structure. 3. Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage. 4. Notify the applicant when it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood resistant construction requirements of the building code is required and notify the applicant when it is determined that work does not constitute substantial improvement or repair of substantial damage.

(Ord. 1318 § 1, 2001; Ord. No. 1693, § 4, 5-14-24)

Ask a question about Rialto law

Corpus searches the Rialto sections it holds and shows the ones that match, with their citations. Free, no sign-in.