For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.75.200 — Standards for manufactured homes

Municipal Code of the City of Rialto, California (Codified through Ordinance No. 1713, passed April 28, 2026. (Supp. No. 39)) · Rialto Municipal Code § 18.75.200

Corpus is an independent public-information project, not the official City of Rialto website. Stable reference: corpuslaw.us/code/4ead563b-d00a-40a2-887a-de8675b4977c

18.75.200 - Standards for manufactured homes.

A. All manufactured homes that are placed or substantially improved, within Zones A1-30, AH, and AE on the community's Flood Insurance Rate Map, on sites located 1. Outside of a manufactured home park or subdivision, 2. In a new manufactured home park or subdivision, 3. In an expansion to an existing manufactured home park or subdivision, or 4. In an existing manufactured home park or subdivision on a site upon which a manufactured home has incurred "substantial damage" as the result of a flood, shall be elevated on a permanent foundation such that the lowest floor of the manufactured home is elevated one foot above the base flood elevation (the state of California recommends at least two feet above the base flood elevation) and be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement. B. All manufactured homes to be placed or substantially improved on sites in an existing manufactured home park or subdivision within zones A1-30, AH and AE on the community's flood insurance rate map that are not subject to the provisions of subsection (A) of this section will be securely fastened to an adequately anchored foundation system to resist flotation, collapse, and lateral movement, and be elevated so that either the: 1. Lowest floor of the manufactured home is one foot above the base flood elevation (the State of California recommends at least two feet above the base flood elevation), or 2. Manufactured home chassis is supported by reinforced piers or other foundation elements of at least equivalent strength that are no less than 36 inches in height above grade. Upon the completion of the structure, the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, and verified by the community building-inspector to be properly elevated. Such certification and verification shall be provided to the Floodplain Administrator.

(Ord. 1318 § 1, 2001; Ord. No. 1693, § 6, 5-14-24)

Ask a question about Rialto law

Corpus searches the Rialto sections it holds and shows the ones that match, with their citations. Free, no sign-in.