§ 14.12.110 — City's Prior Rights and Applicant Responsibility for Facility Relocation
Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 14.12.110
Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/870e7cc1-bfbe-46f3-bae7-f59f1968b475
14.12.110 - City's Prior Rights and Applicant Responsibility for Facility Relocation.
(a) Every application shall contain Applicant's signed statement, that as to any Encroachment not placed in a Right-of-way which is prior in time and/or right to the City's Right-of-way, if any tank, pipe, conduit, duct, tunnel, pole, anchor, or overhead line placed in the Excavation or obstruction for which a Permit is issued interferes with the subsequent improvement, grading or realignment of the Highway or Public Place by the City then the Applicant and their successors or assigns will at their own expense remove such tank, pipe, conduit, duct, tunnel, pole, anchor, or overhead line, or relocate at a location designated by the Director. (b) No Utility owned by the City shall be moved to accommodate the Applicant without prior Director approval. Upon such agreement, any and all costs associated with such work shall be borne by the Applicant. (c) City shall not be required to pay for moving utilities, when acting as an Applicant unless State or Federal law requires said payment. The cost of moving Conflicting Utilities shall be borne by the Applicant unless other arrangements with the owner of the Utility are made, or unless State or Federal law specifies otherwise.
(Ord. No. 2003-1196, 8-26-03; Ord. No. 2022-1521, § 2, 9-13-2022)
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.
