For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20.260.070 — Application Submittal Requirements

Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.260.070

Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/6490f507-d4d2-4a84-89f7-3a6b142099b8

Section 20.260.070 - Application Submittal Requirements

Application for an RDP shall be made in accordance with the procedures set forth in this section. A. Chapter Compliance. Although an RDP is not required for a single lot proposing a single-family dwelling unit or accessory structure, the applicant shall conform to the design and development standards in this Zoning Ordinance prior to approval of a building permit. B. Filing. An application for an RDP may be made by the record owner or owners of the property affected or authorized agent of the owner or owners. The application shall be filed with the Planning Division upon filing forms required by the Planning Division. The application shall be accompanied by the requirements listed under Section 20.260.070.D, which allow for detailed review pursuant to this chapter and demonstrate compliance with this Zoning Ordinance. C. Noticing and Fee. At the time of filing the RDP application, which will include a Public Notice procedure consistent with that described in 20.260.060, above, the applicant shall pay a processing fee as established by the City plus appropriate environmental fees. D. Submittal Requirements. The required submittal of plans and material are as follows: 1. Legal description, Assessor's Parcel Number, and vicinity map. 2. A brief outline of proposed project. 3. A description of and zoning of adjacent properties. 4. Photographs of site. 5. An existing conditions map showing all trees, shrubs, vegetation, rock outcroppings, ridges and hilltops, drainage courses, lakes, ponds, access points, easements, existing buildings, proposed buildings, above-grade utility lines, buildings on adjacent lots within fifty (50) feet of the project property line, and any other significant natural features. 6. A slope map with a minimum two (2)-foot contour interval at a scale of one (1) inch = one hundred (100) feet clearly depicting all contours on-site. In cases where applicant may rely on an off-site easement for brush management and access, show all slopes in these areas as well. 7. A preliminary soils report submitted by a certified engineer. 8. A preliminary hydrology report. 9. An erosion control plan. 10. Grading and drainage plan, if applicable. 11. Fuel Management Plan. 12. A landscape plan. 13. Plans and elevation or rendering of proposed dwelling and other buildings. 14. Samples of the proposed building material on a material board. 15. A photo simulation may be required for subdivisions of five (5) or more lots, or as determined by the Director. The simulation should be taken from off-site viewing platforms and showing the relationship between the Primary/Secondary Ridgeline versus the proposed development as determined by the Director. Minor subdivisions may still require, at a minimum, visual cross-sections as determined by the Director. 16. Other technical studies addressing visual and design aspects of the project as deemed necessary by the Director.

Ask a question about San Marcos law

Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.