§ 20.260.080 — Development Regulation Modifications

Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.260.080

Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/42391da7-3c4a-4f1e-bb63-47c552f9b61d

Section 20.260.080 - Development Regulation Modifications

When the strict literal interpretation and/or enforcement of the provisions of this chapter creates practical difficulties or results that are inconsistent with the goals and purposes of the ROZ, a modification of the applicable development regulations and/or required setbacks may be granted in accordance with the following. A. Request for Modification Procedure. The variance procedure established by Chapter 20.525 (Variances) of this Zoning Ordinance, including noticing and appeals procedures, shall be applicable to the modification of development regulations within the ROZ. However, for any ROZ modifications the Planning Commission shall have final review and approval responsibilities, subject to the following finding requirements in place of those findings required by Section 20.525.040 (Required Findings). 1. The visual impacts of the proposed development have been minimized through creative or innovative design. a. A photo simulation, acceptable to the Director, of the proposed development (exempting single-family units in compliance with this chapter) shall be submitted with the modification application to properly evaluate the scope of minimization of visual impacts. 2. Granting of any modification will not be materially detrimental to the public health, safety, or welfare, or injurious to the property or improvement in the vicinity and Zone in which the property is located. 3. Granting of any modification will be adversely affect the silhouette of any ridgeline and not adversely affect the overall goals and purposes of the ROZ. B. Pipeline Projects/Exemption from Modification Process. Single family properties currently in the moratorium pipeline which are not directly on the ridgeline, are exempt from the Modification procedures as long as development is in keeping with the parameters of the ordinance. Those single family properties directly on a ridgeline and unable to meet the ordinance parameters are required to go through the Modification process with no photo simulations and at an expedited pace (2—3 months). C. Modification of Ridgeline Development Permit. Any permitted projects reviewed and approved under the ROZ that requires a modification and is considered an intensification of the original approval must request and receive approval by means of a substantial conformance determination by the Planning Commission.

(Ord. No. 2025-1568, § 2(Exh. B), 12-9-2025)