§ 20.465.030 — Permit Requirement for all Wireless Telecommunications Facilities
Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.465.030
Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/c42c5be7-e144-4a46-8a47-97510a242e64
Section 20.465.030 - Permit Requirement for all Wireless Telecommunications Facilities
The provisions of this chapter apply to all public and private utilities and service providers, and to wireless telecommunication facilities of any kind located within the City. No Wireless Telecommunications Facility shall be installed, expanded, modified by the installation, change, or removal of antennas until and unless the applicant/operator has obtained the applicable City permits. A. Administrative Wireless Telecommunications Facility Permit. All proposed facilities within the preferred zones/locations as set forth in Section 20.465.050.A, which meet the design requirements, may be processed through an administrative Wireless Telecommunications Facility permit. The application and all submittal materials identified in Section 20.465.060 (Application Content for All Wireless Telecommunications Facilities) are to be submitted to the Planning Division for processing. The Director must provide ten (10) days written notice of the decision. B. Conditional Use Permit. All proposed Wireless Telecommunications Facilities located within the discouraged locations are subject to a Conditional Use Permit in accordance with this chapter provisions and San Marcos Municipal Code (SMMC) Chapter 20.520. In addition, a public workshop will be required for all proposed Wireless Telecommunications Facilities located within residential and agricultural zones. 1. Wireless Telecommunications Facilities are permitted in a discouraged location as delineated in Section 20.465.050.B only if an applicant obtains a Conditional Use Permit following a public hearing with the Planning Commission and the applicant provides technically sufficient and conclusive proof that the proposed location is necessary to avoid an effective prohibition of service, which may include whether the proposed location is necessary to close a significant gap and there is no less intrusive means to close that significant gap. 2. The Planning Commission must take into consideration the following factors: a. Compliance with this Chapter; b. Height and setbacks; c. Proximity to residential uses; d. The nature of uses on adjacent and nearby properties; e. Surrounding topography and landscaping; f. Quality and compatibility of design and screening; g. Impacts on public views and the visual quality of the surrounding area; h. Availability of other facilities and buildings for collocation.
(Ord. No. 2023-1530, § B(Exh. A), 3-14-2023)
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.
