For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20.465.080 — Maintenance and Operation Standards

Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 20.465.080

Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/71ea8829-e9a8-4f89-8ebb-3e04c0ad928f

Section 20.465.080 - Maintenance and Operation Standards

A. Maintenance. All facilities, landscaping, and related equipment must be maintained in good working condition and must be maintained free of litter, debris, graffiti and any form of vandalism. B. Facility Maintenance. Damaged equipment and damaged, dead or decaying landscaping must be replaced within 30 days of notification by the City or discovery by operator. Replacement of landscaping that provides facility screening must be in conformance with the approved landscape plan (i.e., material must be consistent with the approved size (including height)), type, and screening capability at the time of planting as the material being replaced. C. Maintenance Hours. Routine maintenance of Wireless Telecommunications Facilities located in residential and agricultural zones or within 100 feet of a residential zone and agricultural zones may be conducted only during the hours of 8:00 a.m. and 5:00 p.m. Pacific Time weekdays, not including holidays. In other areas, routine maintenance may be conducted at any time. Emergency repairs and maintenance shall be conducted only in the cases of power outages and equipment failure or malfunction. The City shall determine when routine cycling of generators is permissible. D. Graffiti Abatement. Graffiti must be removed within seventy-two (72) hours of notice from neighbors and/or the City. E. Flag Condition. If a flagpole is used for camouflaging a facility, flags must be flown and properly maintained at all times. Display of the United State Flag must fully comply with 4 U.S.C. §§ 6—8. F. Contact Information. All equipment cabinets/enclosures and enclosure entry must display in permanent and legible form the site operator's name, a local or toll free telephone number answered 24 hours every day of the year, and site identification number. G. Security Lighting. Security lighting must be kept to a minimum and must only be activated by a motion detector or hand-set timer. The motion detector must automatically turn off the security lighting no more than fifteen (15) minutes if no movement is detected within the sensor range. The hand-set timer must automatically turn off the security lighting no more than sixty (60) minutes after setting. H. Noise. All noise producing equipment associated with a Wireless Telecommunications Facility (including without limitation temporary and permanent power generators and air conditioners) must be designed and operated consistent with City noise standards (Section 20.300.070). I. FCC Compliance. 1. Validation of Proper Operation. Prior to unattended operations, the applicant for approvals with respect to any wireless telecommunications facility site that is not "categorically excluded" as that term is defined in the FCC Office of Engineering and Technology Bulletin 65 ("FCC OET Bulletin 65"), as amended or replaced from time to time, must submit to the City, at its own cost and expense, a detailed technical report prepared by a qualified engineer verifying that the operation of the wireless telecommunications facility is in conformance with the uncontrolled/general population RF exposure standards established by the FCC OET Bulletin 65. The applicant, at its own cost and expense, must pay the cost of the City's review or peer review of said report. To the extent that a wireless carrier has one or more reports on the wireless telecommunications facility, all reports must be provided to the City. 2. The applicant, operator, or owner of CUP approvals with respect to any wireless telecommunications facility, must, at its own cost and expense, submit an annual CUP compliance report in conjunction with subsection I.1, above. Said report must include documentation of the status of compliance with all conditions of approval and must include date stamped photographs of existing conditions of the wireless telecommunications facility and any associated screening requirements. 3. The wireless telecommunications facility must comply with all applicable current and future FCC regulations without further action by the City. It is the responsibility of the applicant to contact the City acknowledging any changes in regulations that would affect the wireless telecommunications facility. 4. Subject to applicable laws, the City may require all safety signage be in both English and Spanish languages. J. Performance Bond. Prior to issuance of a building permit or encroachment permit, the applicant or owner/operator of the wireless telecommunications facility must pay for and provide a performance bond, which shall be in effect until all facilities are fully and completely removed and the site is reasonably returned to its original condition. The purpose of the bond is to cover the applicant's or owner/operator obligation under the conditions of approval and the SMMC. The bond coverage must include, but not be limited to, removal of the wireless telecommunications facility, maintenance obligations and landscaping obligations. (The amount of the performance bond shall be set by the Director on a case-by case basis and in an amount reasonably related to the obligations required under this Chapter and all conditions of approval, and must be specified in the conditions of approval.)

(Ord. No. 2014-1398, 8-12-2014; Ord. No. 2023-1530, § B(Exh. A), 3-14-2023)

Ask a question about San Marcos law

Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.