§ 8.56.340 — Minimum Requirements for Disposal Lines
Municipal Code of the City of San Marcos, California (Codified through Ordinance No. 2026-1582, enacted September 22, 2026. (Supp. No. 14)) · San Marcos Municipal Code § 8.56.340
Corpus is an independent public-information project, not the official City of San Marcos website. Stable reference: corpuslaw.us/code/b068b8f5-4a1b-4757-97d0-eea0070dd1e0
8.56.340 - Minimum Requirements for Disposal Lines.
Any subsurface tile system hereafter constructed or installed in the City for the purpose of disposing of the effluent from a septic tank shall meet the following minimum specifications: (a) Such tile system shall consist of at least two lateral absorption lines totaling at least 200 feet in length. (b) Lateral absorption lines shall be constructed of tile pipe spaced one quarter inch apart so as to provide open joints. The upper one-half of each open joint shall be covered with tar paper or copper screen. Perforated pipe, of materials approved by the Director, may also be used. (c) Each lateral absorption line shall be placed in a trench 36 inches deep and 18 inches of rock or gravel grading one to 1-1/2 inch. At least 12 inches of such rock or gravel shall be beneath the bottom of the line, and four inches of such rock and gravel shall be over the top of the line. (d) Lateral absorption lines in a serial disposal system shall be level with not more than two inches per 100 feet variation either way. (e) Lateral absorption lines shall not be more than 36 inches below the surface of the ground without the prior approval of the Director. (f) Every lateral absorption line shall be at least ten feet (center to center) from every other lateral absorption line. All bends used in the disposal field shall have one tight joint to each end of the bend.
Ask a question about San Marcos law
Corpus searches the San Marcos sections it holds and shows the ones that match, with their citations. Free, no sign-in.
