For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.06.040 — Administration

Municipal Code, City of Santa Clarita, California (Santa Clarita Municipal Code current through legislation adopted 09-08-2026 (eCode360 publication SA4627, scraped 2026-11-18)) · Santa Clarita Municipal Code § 10.06.040

Corpus is an independent public-information project, not the official City of Santa Clarita website. Stable reference: corpuslaw.us/code/2c2569ea-9419-4d2e-934e-80bfa52a693f

§ 10.06.040: Administration.

A. Designation of the Floodplain Administrator. The Director of Public Works is hereby appointed to administer, implement, and enforce this chapter by granting or denying development permits in accord with its provisions. B. Duties and Responsibilities of the Floodplain Administrator. The duties and responsibilities of the Floodplain Administrator shall include, but not be limited to, the following: 1. Permit Review. Review all floodplain area development permits to determine that: a. Permit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures; b. All other required State and Federal permits have been obtained; c. The site is reasonably safe from flooding; d. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one (1) foot at any point within the City of Santa Clarita; and e. All letters of map revision (LOMRs) for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. 2. Development of Substantial Improvement and Substantial Damage Procedures. a. Using FEMA publication FEMA 213, "Answers to Questions About Substantially Damaged Buildings," develop detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining "market value." b. Assure procedures are coordinated with other departments/divisions and implemented by community staff. c. Any reconstruction, rehabilitation or additions to existing permitted structures constructed not compliant to the provisions of this chapter must be evaluated to determine if the proposed scope of work exceeds the "substantial improvement" or "substantial damage" threshold. An analysis based on the current City policy must be submitted to, and approved by, the Public Works Department prior to the issuance of building permits. 3. Review, Use and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with Section 10.06.030(B), the Floodplain Administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a Federal or State agency, or other source, in order to administer Section 10.06.050. Any such information shall be submitted to the City Council for adoption. Note: A base flood elevation may be obtained using one (1) of two (2) methods from the FEMA publication FEMA 265, "Managing Floodplain Development in Approximate Zone A Areas – A Guide for Obtaining and Developing Base (100-Year) Flood Elevations" dated July 1995. 4. Notification of Other Agencies. a. Alteration or Relocation of a Watercourse. i. Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation; ii. Submit evidence of such notification to the Federal Emergency Management Agency; and iii. Assure that the flood-carrying capacity within the altered or relocated portion of said watercourse is maintained. b. Base Flood Elevation Changes Due to Physical Alterations. i. Within six (6) months of information becoming available or project completion, whichever comes first, the Floodplain Administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a letter of map revision (LOMR). ii. All LOMRs for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued on conditional letters of map revisions (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the "start of construction" definition. iii. Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data. c. Changes in Corporate Boundaries. i. Notify FEMA in writing whenever the corporate boundaries have been modified by annexation or other means and include a copy of a map of the community clearly delineating the new corporate limits. 5. Documentation of Floodplain Developments. Obtain and maintain for public inspection and make available as needed the following: a. Certification required by Sections 10.06.050(A)(3)(a) and (D) (lowest floor elevations); b. Certification required by Section 10.06.050(A)(3)(b) (elevation or floodproofing of nonresidential structures); c. Certification required by Section 10.06.050(A)(3)(c) (wet floodproofing standard); d. Certification of elevation required by Section 10.06.050(C)(1)(c) (subdivision standards); and e. Certification required by Section 10.06.050(F)(2) (floodway encroachments). 6. Map Determinations. Make interpretations where needed as to the exact location of the boundaries of the areas of special flood hazard; for example, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in subsection (E) of this section. 7. Remedial Action. Take action to remedy violations of this chapter as specified in Section 10.06.030(C). 8. Biennial Report. Complete and submit biennial report to FEMA. 9. Planning. Assure community's General Plan is consistent with floodplain management objectives herein. C. Development Permit. A development permit shall be obtained before any construction or other development, including manufactured homes, within any area of special flood hazard established in Section 10.06.030(B). Application for a development permit shall be made on forms furnished by the City of Santa Clarita. The applicant shall provide the following minimum information: 1. Plans in duplicate, drawn to scale, showing: a. Location, dimensions and elevation of the area in question, existing or proposed structures, existing or proposed fences/walls, storage of materials and equipment and their location; b. Proposed locations of water supply, sanitary sewer and other utilities; c. Grading information showing existing and proposed contours, any proposed fill and drainage facilities; d. Location of the regulatory floodway when applicable; e. Base flood elevation information as specified in Section 10.06.030(B) or subsection (B)(3) of this section; f. Proposed elevation in relation to mean sea level of the lowest floor (including basement) of all structures; and g. Proposed elevation in relation to mean sea level to which any nonresidential structure will be floodproofed, as required in Section 10.06.050(A)(3)(b) and detailed in FEMA Technical Bulletin TB 3-93. 2. Certification from a registered professional civil engineer or licensed land surveyor that the nonresidential floodproofed building meets the floodproofing criteria in Section 10.06.050(A)(3)(b). 3. For a crawl-space foundation, location and total net area of foundation openings as required in Section 10.06.050(A)(3)(c) and detailed in FEMA Technical Bulletins TB 1, TB 7-93, and all subsequent revisions. 4. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. 5. All appropriate certifications listed in subsection (B)(5) of this section. D. Work Commencing Before Permit Issuance. Any person who commences any manmade change to improved or unimproved property, including but not limited to buildings or other structures, fences/walls, mining, dredging, filling, grading, paving, excavation or drilling operations, storage of equipment or materials or any other "obstruction" as defined in Section 10.06.020, for which a permit is required by this code before obtaining the necessary permits, shall be subject to an investigation fee whether or not a permit is then or subsequently issued. The investigation fee shall be equal to twice the amount of the review fee. Payment of such fee shall not exempt any person from compliance with all other provisions of this code nor from any other penalty prescribed by law. E. Appeals. The City Council of the City of Santa Clarita shall hear and decide appeals when it is alleged there is an error in any requirement, decision, or determination made by the Floodplain Administrator in the enforcement or administration of this chapter. Appeals to the City Council shall be in accordance with Chapter 2.04.

( Ord. 97-11 , 7/8/1997 ; Ord. 08-11 § 2, 8/26/2008 ; Ord. 13-6 § 4 (Exh. C), 5/28/2013 ; Formerly 10.06.030 )

Ask a question about Santa Clarita law

Corpus searches the Santa Clarita sections it holds and shows the ones that match, with their citations. Free, no sign-in.