§ 17.51.007 — Connected City Infrastructure Program
Municipal Code, City of Santa Clarita, California (Santa Clarita Municipal Code current through legislation adopted 09-08-2026 (eCode360 publication SA4627, scraped 2026-11-18)) · Santa Clarita Municipal Code § 17.51.007
Corpus is an independent public-information project, not the official City of Santa Clarita website. Stable reference: corpuslaw.us/code/12184b0b-1c33-4a2a-9006-c9aa57449ad6
§ 17.51.007: Connected City Infrastructure Program.
A. Definitions. "Fiber optics" means the technology and medium of glass filaments through which light is used to transport information over long distances for communication purposes. Fiber-optic cabling typically consists of a varied amount of individual fiber strands using this technology for communication purposes. "Conduit" means rigid tubing or pipe typically placed underground to house and protect electric wiring, including low-voltage and fiber-optic strands and cables. B. Requirements. Due to the capacity of fiber-optic technology to address diverse telecommunication needs in the twenty-first century, such access to high-speed internet for local residents and businesses, new conduit(s) with or without fiber-optic cabling shall be installed, per the City Engineer's discretion, to connect a development's infrastructure to the City's fiber-optic network, and will be a condition of issuance of a grading or building permit for any of the following: 1. Grading for new commercial or industrial development; 2. New commercial or industrial building construction; 3. Addition to a commercial or industrial building exceeding fifty percent (50%) of the area of the existing building; 4. Repaving of more than fifty percent (50%) of the parking area serving a commercial or industrial development. All applicable development or construction plans shall demonstrate compliance with this "Connected City Infrastructure Program." All new conduit and/or fiber shall be installed per City specifications to the satisfaction of the City Engineer. Any conduit installed within the public right-of-way shall be dedicated to the City. All costs associated with this program shall be paid by the developer. Nothing in this code shall be deemed to impose any liability for damages or a duty of care and maintenance upon the City or upon any of its officers or employees.
( Ord. 20-10 § 6, 12/8/2020 )
Ask a question about Santa Clarita law
Corpus searches the Santa Clarita sections it holds and shows the ones that match, with their citations. Free, no sign-in.
