For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 129.0202 — When a Building Permit Is Required

San Diego Municipal Code (City Clerk PDFs, pages revised through October 2026) · San Diego Municipal Code § 129.0202

Corpus is an independent public-information project, not the official City of San Diego website. Stable reference: corpuslaw.us/code/160765e6-5ab5-40bb-869b-45bb3987b03e

§129.0202 When a Building Permit Is Required

(a) No structure regulated by the Land Development Code shall be erected, constructed, enlarged, altered, repaired, improved, converted, permanently relocated or partially demolished unless a Building Permit has first been obtained from the Building Official, except as exempted in Sections 129.0202(b) and 129.0203. (b) Separate Building Permits are not required for a dwelling and associated accessory structures located on the same property and described in the Building Permit application, plot plan, and other drawings. (c) The placement of factory-built housing, meaning one or more factory-assembled components comprising a single structure suitable for human occupancy that is brought to the job site for connection to a foundation or a site built structure, or manufactured homes, requires a Building Permit in accordance with this division.

(Added 12-9-1997 by O-18451 N.S.; effective 1-1-2000.) (Amended 6-18-2013 by O-20261 N.S.; effective 7-19-2013.) (Amended 5-8-2023 by O-21642 N.S.; effective 6-7-2023.)

Ask a question about San Diego law

Corpus searches the San Diego sections it holds and shows the ones that match, with their citations. Free, no sign-in.